Financial Summary |
|
Contract Amount: | |
Suggested Contribution: | |
Total Commitments Received: | $450,000.00 |
100% SP&R Approval: | Approved |
Contact Information |
|||
Lead Study Contact(s): | Mustafa Mohamedali | ||
Mustafa.Mohamedali@wsdot.wa.gov | |||
Phone: 360-704-6307 | |||
FHWA Technical Liaison(s): | Jerry Shen | ||
jia-dzwan.shen@dot.gov | |||
Phone: 202- 366-4619 | |||
Study Champion(s): | Amy Leland | ||
lelanda@wsdot.wa.gov |
Organization | Year | Commitments | Technical Contact Name | Funding Contact Name |
---|---|---|---|---|
Alaska Department of Transportation and Public Facilities | 2023 | $30,000.00 | Nick Murray | Cristina DeMattio |
Alaska Department of Transportation and Public Facilities | 2024 | $30,000.00 | Nick Murray | Cristina DeMattio |
Alaska Department of Transportation and Public Facilities | 2025 | $30,000.00 | Nick Murray | Cristina DeMattio |
California Department of Transportation | 2023 | $30,000.00 | Chris Traina | Sang Le |
California Department of Transportation | 2024 | $30,000.00 | Chris Traina | Sang Le |
Federal Highway Administration | 2021 | $50,000.00 | Jerry Shen | Jerry Shen |
Federal Highway Administration | 2022 | $20,000.00 | Jerry Shen | Jerry Shen |
Federal Highway Administration | 2023 | $20,000.00 | Jerry Shen | Jerry Shen |
Federal Highway Administration | 2024 | $20,000.00 | Jerry Shen | Jerry Shen |
Nevada Department of Transportation | 2024 | $50,000.00 | Jessen Mortensen | Lucy Koury |
Nevada Department of Transportation | 2025 | $50,000.00 | Jessen Mortensen | Lucy Koury |
Washington State Department of Transportation | 2021 | $20,000.00 | Amy Leland | Mustafa Mohamedali |
Washington State Department of Transportation | 2022 | $30,000.00 | Amy Leland | Mustafa Mohamedali |
Washington State Department of Transportation | 2023 | $20,000.00 | Amy Leland | Mustafa Mohamedali |
Washington State Department of Transportation | 2025 | $20,000.00 | Amy Leland | Mustafa Mohamedali |
Displacement capacity and energy dissipation in conventional RC columns comes at the cost of severe damage to concrete and steel and permanent displacement of the bridges and other structures including marine structures during extreme events such as earthquake, ice load, collision by vessels and vehicles, tsunamis, check floods, and blasts. The resiliency of these structures can be significantly increased if these problems can be eliminated using shape memory alloy (SMA) and engineered cementitious composite (ECC). Comparison of residual displacement in laboratory testing of column models demonstrated that residual displacement was 86% lower than that the columns with conventional materials. The Washington State Department of transportation (WSDOT) implemented SMA/ECC in the columns of the SR-99 on-ramp bridge in downtown Seattle. With the price of Nickel-Titanium SMA (NiTi) being 90 times the mild steel cost, bridge owners may be reluctant to adopt the material. To offset SMA material costs, a new generation of Copper-Aluminum-Manganese (CAM) SMA bar that is approximately 80-90% less expensive than NiTi is emerging. The alloy is composed of 72% Copper, 17% Aluminum, and 11% Manganese. No. 10 CAM bars have been developed and were recently tested along with Headed Reinforcement Corp’s (HRC) couplers at University of Nevada – Reno (UNR) with good results, i.e. large-diameter bars for use in actual bridges have already proven to be feasible. CAM bars are connected to steel bars that extend into the column and footings or cap beams. No CAM-reinforced columns incorporating the (HRC) splice has yet been studied, however, an exploratory study was conducted by shake table testing of a column model incorporating threaded CAM bars. These bars had to be machined to a dog bone shape to avoid fracture at the threaded ends. Engineered Cementitious Composite (ECC) was used in the plastic hinge region. ECC is a fiber-reinforced cement-based concrete which has high tensile ductility and high compressive and tensile strengths.. The column performed very well in limiting residual displacement while eliminating plastic hinge damage. Another SMA type, the low-cost iron-based SMA is also emerging, although its performance under extreme loads is yet to be studied. The advantage of Fe-SMA over CAM, should it prove successful, is having material characteristics that are similar to those of conventional steel that is readily used in bridge construction while being at a low cost.
The objective of this research project is to:
Direct comparisons will be made with Nickel-Titanium (NiTi) SEAs (and traditional steel reinforcing bars as applicable) to illustrate the advantages/disadvantages of each material. If successfully demonstrated for their suitable characteristics, the CAM and Fe-SMA SEA bars could replace their NiTi counterparts at a significantly lower (up to ten times) cost and accelerate their applications in bridges. Therefore, the outcomes of this project are directly relevant to state departments of transportation and bridge and structural engineers and designers. This proposed project will build on the success of previously implemented WSDOT’s application of shape memory alloy/engineered cementitious composite (SMA/ECC) in the columns of the SR-99 on-ramp bridge in downtown Seattle while making a direct impact on advancing and securing the national transportation network.
PHASE 1 ($120,000, 12 months)
PHASE 2 ($280,000, 24 months)
Pooled fund participation is considered for states subjected to seismic and other extreme events for their contribution. This three-year research project is to be executed in two phases and estimated to cost a total of $400k and we are seeking commitments of between $20 k to $30 k per state depending upon the number participating. FHWA has also indicated their support and their contribution will depend on the number of states making a commitment to participate. The study will be initiated immediately the Phase 1 threshold funding is obligated.
Subjects: Bridges, Other Structures, and Hydraulics and Hydrology Materials and Construction Safety and Human Performance
General Information |
|
Study Number: | TPF-5(491) |
Lead Organization: | Washington State Department of Transportation |
Solicitation Number: | 1517 |
Partners: | AK, CA, FHWA, NV, WA |
Status: | Cleared by FHWA |
Est. Completion Date: | |
Contract/Other Number: | |
Last Updated: | Oct 30, 2024 |
Contract End Date: |
Financial Summary |
|
Contract Amount: | |
Total Commitments Received: | $450,000.00 |
100% SP&R Approval: |
Contact Information |
|||
Lead Study Contact(s): | Mustafa Mohamedali | ||
Mustafa.Mohamedali@wsdot.wa.gov | |||
Phone: 360-704-6307 | |||
FHWA Technical Liaison(s): | Jerry Shen | ||
jia-dzwan.shen@dot.gov | |||
Phone: 202- 366-4619 |
Organization | Year | Commitments | Technical Contact Name | Funding Contact Name | Contact Number | Email Address |
---|---|---|---|---|---|---|
Alaska Department of Transportation and Public Facilities | 2023 | $30,000.00 | Nick Murray | Cristina DeMattio | +1 9074515382 | Cristina.DeMattio@alaska.gov |
Alaska Department of Transportation and Public Facilities | 2024 | $30,000.00 | Nick Murray | Cristina DeMattio | +1 9074515382 | Cristina.DeMattio@alaska.gov |
Alaska Department of Transportation and Public Facilities | 2025 | $30,000.00 | Nick Murray | Cristina DeMattio | +1 9074515382 | Cristina.DeMattio@alaska.gov |
California Department of Transportation | 2023 | $30,000.00 | Chris Traina | Sang Le | (916)701-3998 | sang.le@dot.ca.gov |
California Department of Transportation | 2024 | $30,000.00 | Chris Traina | Sang Le | (916)701-3998 | sang.le@dot.ca.gov |
Federal Highway Administration | 2021 | $50,000.00 | Jerry Shen | Jerry Shen | (202) 366-4619 | jia-dzwan.shen@dot.gov |
Federal Highway Administration | 2022 | $20,000.00 | Jerry Shen | Jerry Shen | (202) 366-4619 | jia-dzwan.shen@dot.gov |
Federal Highway Administration | 2023 | $20,000.00 | Jerry Shen | Jerry Shen | (202) 366-4619 | jia-dzwan.shen@dot.gov |
Federal Highway Administration | 2024 | $20,000.00 | Jerry Shen | Jerry Shen | (202) 366-4619 | jia-dzwan.shen@dot.gov |
Nevada Department of Transportation | 2024 | $50,000.00 | Jessen Mortensen | Lucy Koury | (775) 888-7223 | lkoury@dot.nv.gov |
Nevada Department of Transportation | 2025 | $50,000.00 | Jessen Mortensen | Lucy Koury | (775) 888-7223 | lkoury@dot.nv.gov |
Washington State Department of Transportation | 2021 | $20,000.00 | Amy Leland | Mustafa Mohamedali | 360-704-6307 | Mustafa.Mohamedali@wsdot.wa.gov |
Washington State Department of Transportation | 2022 | $30,000.00 | Amy Leland | Mustafa Mohamedali | 360-704-6307 | Mustafa.Mohamedali@wsdot.wa.gov |
Washington State Department of Transportation | 2023 | $20,000.00 | Amy Leland | Mustafa Mohamedali | 360-704-6307 | Mustafa.Mohamedali@wsdot.wa.gov |
Washington State Department of Transportation | 2025 | $20,000.00 | Amy Leland | Mustafa Mohamedali | 360-704-6307 | Mustafa.Mohamedali@wsdot.wa.gov |
Displacement capacity and energy dissipation in conventional RC columns comes at the cost of severe damage to concrete and steel and permanent displacement of the bridges and other structures including marine structures during extreme events such as earthquake, ice load, collision by vessels and vehicles, tsunamis, check floods, and blasts. The resiliency of these structures can be significantly increased if these problems can be eliminated using shape memory alloy (SMA) and engineered cementitious composite (ECC). Comparison of residual displacement in laboratory testing of column models demonstrated that residual displacement was 86% lower than that the columns with conventional materials. The Washington State Department of transportation (WSDOT) implemented SMA/ECC in the columns of the SR-99 on-ramp bridge in downtown Seattle. With the price of Nickel-Titanium SMA (NiTi) being 90 times the mild steel cost, bridge owners may be reluctant to adopt the material. To offset SMA material costs, a new generation of Copper-Aluminum-Manganese (CAM) SMA bar that is approximately 80-90% less expensive than NiTi is emerging. The alloy is composed of 72% Copper, 17% Aluminum, and 11% Manganese. No. 10 CAM bars have been developed and were recently tested along with Headed Reinforcement Corp’s (HRC) couplers at University of Nevada – Reno (UNR) with good results, i.e. large-diameter bars for use in actual bridges have already proven to be feasible. CAM bars are connected to steel bars that extend into the column and footings or cap beams. No CAM-reinforced columns incorporating the (HRC) splice has yet been studied, however, an exploratory study was conducted by shake table testing of a column model incorporating threaded CAM bars. These bars had to be machined to a dog bone shape to avoid fracture at the threaded ends. Engineered Cementitious Composite (ECC) was used in the plastic hinge region. ECC is a fiber-reinforced cement-based concrete which has high tensile ductility and high compressive and tensile strengths.. The column performed very well in limiting residual displacement while eliminating plastic hinge damage. Another SMA type, the low-cost iron-based SMA is also emerging, although its performance under extreme loads is yet to be studied. The advantage of Fe-SMA over CAM, should it prove successful, is having material characteristics that are similar to those of conventional steel that is readily used in bridge construction while being at a low cost.
The objective of this research project is to:
Direct comparisons will be made with Nickel-Titanium (NiTi) SEAs (and traditional steel reinforcing bars as applicable) to illustrate the advantages/disadvantages of each material. If successfully demonstrated for their suitable characteristics, the CAM and Fe-SMA SEA bars could replace their NiTi counterparts at a significantly lower (up to ten times) cost and accelerate their applications in bridges. Therefore, the outcomes of this project are directly relevant to state departments of transportation and bridge and structural engineers and designers. This proposed project will build on the success of previously implemented WSDOT’s application of shape memory alloy/engineered cementitious composite (SMA/ECC) in the columns of the SR-99 on-ramp bridge in downtown Seattle while making a direct impact on advancing and securing the national transportation network.
PHASE 1 ($120,000, 12 months)
PHASE 2 ($280,000, 24 months)
Pooled fund participation is considered for states subjected to seismic and other extreme events for their contribution. This three-year research project is to be executed in two phases and estimated to cost a total of $400k and we are seeking commitments of between $20 k to $30 k per state depending upon the number participating. FHWA has also indicated their support and their contribution will depend on the number of states making a commitment to participate. The study will be initiated immediately the Phase 1 threshold funding is obligated.
Subjects: Bridges, Other Structures, and Hydraulics and Hydrology Materials and Construction Safety and Human Performance
Title | File/Link | Type | Private |
---|---|---|---|
2024 Q3 Report Jul-Sep | TPF5-491 2024-Q3 Report.pdf | Progress Report | Public |
2024 Q2 Report Apr-Jun | TPF5-491 2024-Q2 Report.pdf | Progress Report | Public |
Interim Report - Phase 1 | TPF5-491 SMA-ECC Interim Report - Phase1.pdf | TPF Study Documentation | Public |
2024 Q1 Report Jan-Mar | TPF5-491 2024-Q1 Report.pdf | Progress Report | Public |
2023 Q4 Report Oct-Dec | TPF5-491 2023-Q4 Report.pdf | Progress Report | Public |
2023 Q3 Report Jul-Sep | TPF5-491 2023-Q3 Report.pdf | Progress Report | Public |
2023 Q2 Report Apr-Jun | TPF5-491 2023-Q2 Report.pdf | Progress Report | Public |
2023 Q1 Report Jan-Mar | TPF5-491 2023-Q1 Report.pdf | Progress Report | Public |
TPF-5(491) Acceptance Letter | TPF-5(491) Acceptance Memo.pdf | Memorandum | Public |
Title | File/Link | Type | Private |
---|---|---|---|
SMA Pooled Fund Proposal with Graphics | Bridge Office SMA pooled fund attachment v210310 BK.pdf | Other | Public |
Approved Waiver | Approval of SP&R Waiver Pooled Fund Solicitation#1517.pdf | Memorandum | Public |