Super-Elastic Copper-Based and Iron-Based Shape Memory Alloys and Engineered Cementitious Composites for Extreme Events Resiliency

Print
General Information
Study Number: TPF-5(491)
Former Study Number:
Lead Organization: Washington State Department of Transportation
Solicitation Number: 1517
Partners: AK, CA, FHWA, NV, WA
Status: Cleared by FHWA
Est. Completion Date:
Contract/Other Number:
Last Updated: Oct 30, 2024
Contract End Date:
Financial Summary
Contract Amount:
Suggested Contribution:
Total Commitments Received: $450,000.00
100% SP&R Approval: Approved
Contact Information
Lead Study Contact(s): Mustafa Mohamedali
Mustafa.Mohamedali@wsdot.wa.gov
Phone: 360-704-6307
FHWA Technical Liaison(s): Jerry Shen
jia-dzwan.shen@dot.gov
Phone: 202- 366-4619
Study Champion(s): Amy Leland
lelanda@wsdot.wa.gov
Organization Year Commitments Technical Contact Name Funding Contact Name
Alaska Department of Transportation and Public Facilities 2023 $30,000.00 Nick Murray Cristina DeMattio
Alaska Department of Transportation and Public Facilities 2024 $30,000.00 Nick Murray Cristina DeMattio
Alaska Department of Transportation and Public Facilities 2025 $30,000.00 Nick Murray Cristina DeMattio
California Department of Transportation 2023 $30,000.00 Chris Traina Sang Le
California Department of Transportation 2024 $30,000.00 Chris Traina Sang Le
Federal Highway Administration 2021 $50,000.00 Jerry Shen Jerry Shen
Federal Highway Administration 2022 $20,000.00 Jerry Shen Jerry Shen
Federal Highway Administration 2023 $20,000.00 Jerry Shen Jerry Shen
Federal Highway Administration 2024 $20,000.00 Jerry Shen Jerry Shen
Nevada Department of Transportation 2024 $50,000.00 Jessen Mortensen Lucy Koury
Nevada Department of Transportation 2025 $50,000.00 Jessen Mortensen Lucy Koury
Washington State Department of Transportation 2021 $20,000.00 Amy Leland Mustafa Mohamedali
Washington State Department of Transportation 2022 $30,000.00 Amy Leland Mustafa Mohamedali
Washington State Department of Transportation 2023 $20,000.00 Amy Leland Mustafa Mohamedali
Washington State Department of Transportation 2025 $20,000.00 Amy Leland Mustafa Mohamedali

Study Description

Displacement capacity and energy dissipation in conventional RC columns comes at the cost of severe damage to concrete and steel and permanent displacement of the bridges and other structures including marine structures during extreme events such as earthquake, ice load, collision by vessels and vehicles, tsunamis, check floods, and blasts. The resiliency of these structures can be significantly increased if these problems can be eliminated using shape memory alloy (SMA) and engineered cementitious composite (ECC). Comparison of residual displacement in laboratory testing of column models demonstrated that residual displacement was 86% lower than that the columns with conventional materials. The Washington State Department of transportation (WSDOT) implemented SMA/ECC in the columns of the SR-99 on-ramp bridge in downtown Seattle. With the price of Nickel-Titanium SMA (NiTi) being 90 times the mild steel cost, bridge owners may be reluctant to adopt the material. To offset SMA material costs, a new generation of Copper-Aluminum-Manganese (CAM) SMA bar that is approximately 80-90% less expensive than NiTi is emerging. The alloy is composed of 72% Copper, 17% Aluminum, and 11% Manganese. No. 10 CAM bars have been developed and were recently tested along with Headed Reinforcement Corp’s (HRC) couplers at University of Nevada – Reno (UNR) with good results, i.e. large-diameter bars for use in actual bridges have already proven to be feasible. CAM bars are connected to steel bars that extend into the column and footings or cap beams. No CAM-reinforced columns incorporating the (HRC) splice has yet been studied, however, an exploratory study was conducted by shake table testing of a column model incorporating threaded CAM bars. These bars had to be machined to a dog bone shape to avoid fracture at the threaded ends. Engineered Cementitious Composite (ECC) was used in the plastic hinge region. ECC is a fiber-reinforced cement-based concrete which has high tensile ductility and high compressive and tensile strengths.. The column performed very well in limiting residual displacement while eliminating plastic hinge damage. Another SMA type, the low-cost iron-based SMA is also emerging, although its performance under extreme loads is yet to be studied. The advantage of Fe-SMA over CAM, should it prove successful, is having material characteristics that are similar to those of conventional steel that is readily used in bridge construction while being at a low cost.

Objectives

The objective of this research project is to: 

  1. evaluate and test several innovative columns which have self-centering feature to provide minimum residual displacement after earthquake. 
  2. improve column serviceability after earthquake by decreasing damage and spalling of concrete within column plastic hinge region; and 
  3. provide cost comparison among columns having different engineered materials; and 
  4. develop self-centering column design specifications. Particularly, in this proposed research, the low-cycle fatigue characteristics, corrosion resistance, machinability and coupling mechanisms with traditional steel rebar, and cost of CAM and Fe-SMA super-elastic alloy (SEA) bars will be studied. 

Direct comparisons will be made with Nickel-Titanium (NiTi) SEAs (and traditional steel reinforcing bars as applicable) to illustrate the advantages/disadvantages of each material. If successfully demonstrated for their suitable characteristics, the CAM and Fe-SMA SEA bars could replace their NiTi counterparts at a significantly lower (up to ten times) cost and accelerate their applications in bridges. Therefore, the outcomes of this project are directly relevant to state departments of transportation and bridge and structural engineers and designers. This proposed project will build on the success of previously implemented WSDOT’s application of shape memory alloy/engineered cementitious composite (SMA/ECC) in the columns of the SR-99 on-ramp bridge in downtown Seattle while making a direct impact on advancing and securing the national transportation network.

Scope of Work

PHASE 1 ($120,000, 12 months)

  • Task 1: Test CAM and Fe-SMA SEAs under repeated cyclic loading to determine low-cycle fatigue lives at three different temperatures: -40°C, 25°C and 50°C. Compare to NiTi SEAs and steel rebar.
  • Task 2: Based on the material properties obtained/compared in Task 1, conduct moment curvature analyses on various cross sections to find optimal combinations of CAM, Fe-SMA, steel and ECC that result in hinge properties offering superior seismic performance.

PHASE 2 ($280,000, 24 months)

  • Task 3: Conduct cyclic/dynamic test on large-scale column models incorporating large-diameter CAM bars and Fe-SMA to assess resiliency of the new generation of SMA/ECC combination.
  • Task 4: Perform both cyclic polarization testing and long-term salt spray testing followed by gravimetric mass loss and mechanical loading to determine corrosion characteristics.
  • Task 5: Quantify the cost impact of using CAM and Fe-SMA SEAs by comparing representative conventional bridges and their SMA/ECC counterparts.
  • Task 6: Develop design specifications and illustrative examples.

Comments

Pooled fund participation is considered for states subjected to seismic and other extreme events for their contribution. This three-year research project is to be executed in two phases and estimated to cost a total of $400k and we are seeking commitments of between $20 k to $30 k per state depending upon the number participating. FHWA has also indicated their support and their contribution will depend on the number of states making a commitment to participate. The study will be initiated immediately the Phase 1 threshold funding is obligated.

Subjects: Bridges, Other Structures, and Hydraulics and Hydrology Materials and Construction Safety and Human Performance

Documents Attached
Title File/Link Document Category Document Type Privacy Document Date Download
2024 Q3 Report Jul-Sep TPF5-491 2024-Q3 Report.pdf Progress Report Quarterly Progress Report Public 2024-10-14
2024 Q2 Report Apr-Jun TPF5-491 2024-Q2 Report.pdf Progress Report Quarterly Progress Report Public 2024-07-31
Interim Report - Phase 1 TPF5-491 SMA-ECC Interim Report - Phase1.pdf TPF Study Documentation Research Report Public 2024-05-16
2024 Q1 Report Jan-Mar TPF5-491 2024-Q1 Report.pdf Progress Report Quarterly Progress Report Public 2024-04-30
2023 Q4 Report Oct-Dec TPF5-491 2023-Q4 Report.pdf Progress Report Quarterly Progress Report Public 2024-02-01
2023 Q3 Report Jul-Sep TPF5-491 2023-Q3 Report.pdf Progress Report Quarterly Progress Report Public 2023-11-01
2023 Q2 Report Apr-Jun TPF5-491 2023-Q2 Report.pdf Progress Report Quarterly Progress Report Public 2023-07-31
2023 Q1 Report Jan-Mar TPF5-491 2023-Q1 Report.pdf Progress Report Quarterly Progress Report Public 2023-04-27
TPF-5(491) Acceptance Letter TPF-5(491) Acceptance Memo.pdf Memorandum Other Public 2021-12-28
Documents Attached
Title File/Link Document Category Document Type Privacy Document Date Download
SMA Pooled Fund Proposal with Graphics Bridge Office SMA pooled fund attachment v210310 BK.pdf Other Other Public 2021-03-10
Approved Waiver Approval of SP&R Waiver Pooled Fund Solicitation#1517.pdf Memorandum Other Public 2020-02-10

Super-Elastic Copper-Based and Iron-Based Shape Memory Alloys and Engineered Cementitious Composites for Extreme Events Resiliency

General Information
Study Number: TPF-5(491)
Lead Organization: Washington State Department of Transportation
Solicitation Number: 1517
Partners: AK, CA, FHWA, NV, WA
Status: Cleared by FHWA
Est. Completion Date:
Contract/Other Number:
Last Updated: Oct 30, 2024
Contract End Date:
Financial Summary
Contract Amount:
Total Commitments Received: $450,000.00
100% SP&R Approval:
Contact Information
Lead Study Contact(s): Mustafa Mohamedali
Mustafa.Mohamedali@wsdot.wa.gov
Phone: 360-704-6307
FHWA Technical Liaison(s): Jerry Shen
jia-dzwan.shen@dot.gov
Phone: 202- 366-4619
Commitments by Organizations
Organization Year Commitments Technical Contact Name Funding Contact Name Contact Number Email Address
Alaska Department of Transportation and Public Facilities 2023 $30,000.00 Nick Murray Cristina DeMattio +1 9074515382 Cristina.DeMattio@alaska.gov
Alaska Department of Transportation and Public Facilities 2024 $30,000.00 Nick Murray Cristina DeMattio +1 9074515382 Cristina.DeMattio@alaska.gov
Alaska Department of Transportation and Public Facilities 2025 $30,000.00 Nick Murray Cristina DeMattio +1 9074515382 Cristina.DeMattio@alaska.gov
California Department of Transportation 2023 $30,000.00 Chris Traina Sang Le (916)701-3998 sang.le@dot.ca.gov
California Department of Transportation 2024 $30,000.00 Chris Traina Sang Le (916)701-3998 sang.le@dot.ca.gov
Federal Highway Administration 2021 $50,000.00 Jerry Shen Jerry Shen (202) 366-4619 jia-dzwan.shen@dot.gov
Federal Highway Administration 2022 $20,000.00 Jerry Shen Jerry Shen (202) 366-4619 jia-dzwan.shen@dot.gov
Federal Highway Administration 2023 $20,000.00 Jerry Shen Jerry Shen (202) 366-4619 jia-dzwan.shen@dot.gov
Federal Highway Administration 2024 $20,000.00 Jerry Shen Jerry Shen (202) 366-4619 jia-dzwan.shen@dot.gov
Nevada Department of Transportation 2024 $50,000.00 Jessen Mortensen Lucy Koury (775) 888-7223 lkoury@dot.nv.gov
Nevada Department of Transportation 2025 $50,000.00 Jessen Mortensen Lucy Koury (775) 888-7223 lkoury@dot.nv.gov
Washington State Department of Transportation 2021 $20,000.00 Amy Leland Mustafa Mohamedali 360-704-6307 Mustafa.Mohamedali@wsdot.wa.gov
Washington State Department of Transportation 2022 $30,000.00 Amy Leland Mustafa Mohamedali 360-704-6307 Mustafa.Mohamedali@wsdot.wa.gov
Washington State Department of Transportation 2023 $20,000.00 Amy Leland Mustafa Mohamedali 360-704-6307 Mustafa.Mohamedali@wsdot.wa.gov
Washington State Department of Transportation 2025 $20,000.00 Amy Leland Mustafa Mohamedali 360-704-6307 Mustafa.Mohamedali@wsdot.wa.gov

Study Description

Study Description

Displacement capacity and energy dissipation in conventional RC columns comes at the cost of severe damage to concrete and steel and permanent displacement of the bridges and other structures including marine structures during extreme events such as earthquake, ice load, collision by vessels and vehicles, tsunamis, check floods, and blasts. The resiliency of these structures can be significantly increased if these problems can be eliminated using shape memory alloy (SMA) and engineered cementitious composite (ECC). Comparison of residual displacement in laboratory testing of column models demonstrated that residual displacement was 86% lower than that the columns with conventional materials. The Washington State Department of transportation (WSDOT) implemented SMA/ECC in the columns of the SR-99 on-ramp bridge in downtown Seattle. With the price of Nickel-Titanium SMA (NiTi) being 90 times the mild steel cost, bridge owners may be reluctant to adopt the material. To offset SMA material costs, a new generation of Copper-Aluminum-Manganese (CAM) SMA bar that is approximately 80-90% less expensive than NiTi is emerging. The alloy is composed of 72% Copper, 17% Aluminum, and 11% Manganese. No. 10 CAM bars have been developed and were recently tested along with Headed Reinforcement Corp’s (HRC) couplers at University of Nevada – Reno (UNR) with good results, i.e. large-diameter bars for use in actual bridges have already proven to be feasible. CAM bars are connected to steel bars that extend into the column and footings or cap beams. No CAM-reinforced columns incorporating the (HRC) splice has yet been studied, however, an exploratory study was conducted by shake table testing of a column model incorporating threaded CAM bars. These bars had to be machined to a dog bone shape to avoid fracture at the threaded ends. Engineered Cementitious Composite (ECC) was used in the plastic hinge region. ECC is a fiber-reinforced cement-based concrete which has high tensile ductility and high compressive and tensile strengths.. The column performed very well in limiting residual displacement while eliminating plastic hinge damage. Another SMA type, the low-cost iron-based SMA is also emerging, although its performance under extreme loads is yet to be studied. The advantage of Fe-SMA over CAM, should it prove successful, is having material characteristics that are similar to those of conventional steel that is readily used in bridge construction while being at a low cost.

Objectives

The objective of this research project is to: 

  1. evaluate and test several innovative columns which have self-centering feature to provide minimum residual displacement after earthquake. 
  2. improve column serviceability after earthquake by decreasing damage and spalling of concrete within column plastic hinge region; and 
  3. provide cost comparison among columns having different engineered materials; and 
  4. develop self-centering column design specifications. Particularly, in this proposed research, the low-cycle fatigue characteristics, corrosion resistance, machinability and coupling mechanisms with traditional steel rebar, and cost of CAM and Fe-SMA super-elastic alloy (SEA) bars will be studied. 

Direct comparisons will be made with Nickel-Titanium (NiTi) SEAs (and traditional steel reinforcing bars as applicable) to illustrate the advantages/disadvantages of each material. If successfully demonstrated for their suitable characteristics, the CAM and Fe-SMA SEA bars could replace their NiTi counterparts at a significantly lower (up to ten times) cost and accelerate their applications in bridges. Therefore, the outcomes of this project are directly relevant to state departments of transportation and bridge and structural engineers and designers. This proposed project will build on the success of previously implemented WSDOT’s application of shape memory alloy/engineered cementitious composite (SMA/ECC) in the columns of the SR-99 on-ramp bridge in downtown Seattle while making a direct impact on advancing and securing the national transportation network.

Scope of Work

PHASE 1 ($120,000, 12 months)

  • Task 1: Test CAM and Fe-SMA SEAs under repeated cyclic loading to determine low-cycle fatigue lives at three different temperatures: -40°C, 25°C and 50°C. Compare to NiTi SEAs and steel rebar.
  • Task 2: Based on the material properties obtained/compared in Task 1, conduct moment curvature analyses on various cross sections to find optimal combinations of CAM, Fe-SMA, steel and ECC that result in hinge properties offering superior seismic performance.

PHASE 2 ($280,000, 24 months)

  • Task 3: Conduct cyclic/dynamic test on large-scale column models incorporating large-diameter CAM bars and Fe-SMA to assess resiliency of the new generation of SMA/ECC combination.
  • Task 4: Perform both cyclic polarization testing and long-term salt spray testing followed by gravimetric mass loss and mechanical loading to determine corrosion characteristics.
  • Task 5: Quantify the cost impact of using CAM and Fe-SMA SEAs by comparing representative conventional bridges and their SMA/ECC counterparts.
  • Task 6: Develop design specifications and illustrative examples.

Comments

Pooled fund participation is considered for states subjected to seismic and other extreme events for their contribution. This three-year research project is to be executed in two phases and estimated to cost a total of $400k and we are seeking commitments of between $20 k to $30 k per state depending upon the number participating. FHWA has also indicated their support and their contribution will depend on the number of states making a commitment to participate. The study will be initiated immediately the Phase 1 threshold funding is obligated.

Subjects: Bridges, Other Structures, and Hydraulics and Hydrology Materials and Construction Safety and Human Performance

Title File/Link Type Private
2024 Q3 Report Jul-Sep TPF5-491 2024-Q3 Report.pdf Progress Report Public
2024 Q2 Report Apr-Jun TPF5-491 2024-Q2 Report.pdf Progress Report Public
Interim Report - Phase 1 TPF5-491 SMA-ECC Interim Report - Phase1.pdf TPF Study Documentation Public
2024 Q1 Report Jan-Mar TPF5-491 2024-Q1 Report.pdf Progress Report Public
2023 Q4 Report Oct-Dec TPF5-491 2023-Q4 Report.pdf Progress Report Public
2023 Q3 Report Jul-Sep TPF5-491 2023-Q3 Report.pdf Progress Report Public
2023 Q2 Report Apr-Jun TPF5-491 2023-Q2 Report.pdf Progress Report Public
2023 Q1 Report Jan-Mar TPF5-491 2023-Q1 Report.pdf Progress Report Public
TPF-5(491) Acceptance Letter TPF-5(491) Acceptance Memo.pdf Memorandum Public
Title File/Link Type Private
SMA Pooled Fund Proposal with Graphics Bridge Office SMA pooled fund attachment v210310 BK.pdf Other Public
Approved Waiver Approval of SP&R Waiver Pooled Fund Solicitation#1517.pdf Memorandum Public

Currently, Transportation Pooled Fund is not supported on mobile devices, please access this Web portal using a desktop or laptop computer.