Financial Summary |
|
Contract Amount: | $0.00 |
Suggested Contribution: | |
Total Commitments Received: | |
100% SP&R Approval: | Approved |
Contact Information |
|||
Lead Study Contact(s): | Kornel Kerenyi | ||
kornel.kerenyi@dot.gov | |||
Phone: 202-493-3142 | |||
FHWA Technical Liaison(s): | Kornel Kerenyi | ||
kornel.kerenyi@dot.gov | |||
Phone: 202-493-3142 |
Organization | Year | Commitments | Technical Contact Name | Funding Contact Name |
---|---|---|---|---|
South Dakota Department of Transportation | 0 | $0.00 |
Conduct a laboratory study to determine optimum edge conditions for precast culvert inlets; hydraulic design coefficients for multiple barrel box culverts; and derive polynomial equations and prepare design nomographs fo SD culverts to facilitate inclusion in FHWA's HY-8 computer program.
We are revising the final report based on comments from the SD Technical Review Committee. A Public Roads article was submitted based on study results.
Subjects: Bridges, Other Structures, and Hydraulics and Hydrology
No document attached.
No document attached.
General Information |
|
Study Number: | TPF-5(057) |
Lead Organization: | Federal Highway Administration |
Solicitation Number: | 728 |
Partners: | SD |
Status: | Closed |
Est. Completion Date: | |
Contract/Other Number: | |
Last Updated: | May 26, 2009 |
Contract End Date: |
Financial Summary |
|
Contract Amount: | $0.00 |
Total Commitments Received: | |
100% SP&R Approval: |
Contact Information |
|||
Lead Study Contact(s): | Kornel Kerenyi | ||
kornel.kerenyi@dot.gov | |||
Phone: 202-493-3142 | |||
FHWA Technical Liaison(s): | Kornel Kerenyi | ||
kornel.kerenyi@dot.gov | |||
Phone: 202-493-3142 |
Organization | Year | Commitments | Technical Contact Name | Funding Contact Name | Contact Number | Email Address |
---|---|---|---|---|---|---|
South Dakota Department of Transportation | 0 | $0.00 |
Conduct a laboratory study to determine optimum edge conditions for precast culvert inlets; hydraulic design coefficients for multiple barrel box culverts; and derive polynomial equations and prepare design nomographs fo SD culverts to facilitate inclusion in FHWA's HY-8 computer program.
We are revising the final report based on comments from the SD Technical Review Committee. A Public Roads article was submitted based on study results.
Subjects: Bridges, Other Structures, and Hydraulics and Hydrology