Financial Summary |
|
Contract Amount: | $266,667.00 |
Suggested Contribution: | |
Total Commitments Received: | $436,668.00 |
100% SP&R Approval: | Approved |
Contact Information |
|||
Lead Study Contact(s): | Doc Zhang | ||
doc.zhang@la.gov | |||
Phone: 225-767-9162 | |||
FHWA Technical Liaison(s): | Mike Moravec | ||
Mike.Moravec@dot.gov | |||
Phone: 202-366-3982 |
Organization | Year | Commitments | Technical Contact Name | Funding Contact Name |
---|---|---|---|---|
Hawaii Department of Transportation | 2011 | $50,000.00 | Casey Abe | Casey Abe |
Kentucky Transportation Cabinet | 2012 | $25,000.00 | Paul Looney | Jason Siwula |
Kentucky Transportation Cabinet | 2013 | $25,000.00 | Paul Looney | Jason Siwula |
Louisiana Department of Transportation and Development | 2011 | $25,000.00 | Doc Zhang | Tyson Rupnow |
Louisiana Department of Transportation and Development | 2012 | $25,000.00 | Doc Zhang | Tyson Rupnow |
Maryland Department of Transportation State Highway Administration | 2011 | $16,667.00 | Geoffrey Hall | Allison Hardt |
Maryland Department of Transportation State Highway Administration | 2012 | $16,667.00 | Geoffrey Hall | Allison Hardt |
Maryland Department of Transportation State Highway Administration | 2013 | $16,666.00 | Geoffrey Hall | Allison Hardt |
Michigan Department of Transportation | 2012 | $0.00 | Michael Eacker | Andre' Clover |
Michigan Department of Transportation | 2013 | $25,000.00 | Michael Eacker | Andre' Clover |
Michigan Department of Transportation | 2014 | $25,000.00 | Michael Eacker | Andre' Clover |
Nevada Department of Transportation | 2016 | $10,000.00 | Yathi Vivekananthan | Ken Chambers |
Nevada Department of Transportation | 2017 | $10,000.00 | Yathi Vivekananthan | Ken Chambers |
New Hampshire Department of Transportation | 2011 | $20,000.00 | Robert Bollinger | Ann Scholz |
New Hampshire Department of Transportation | 2012 | $20,000.00 | Robert Bollinger | Ann Scholz |
New Hampshire Department of Transportation | 2013 | $10,000.00 | Robert Bollinger | Ann Scholz |
North Carolina Department of Transportation | 2010 | $20,000.00 | Kent Taylor | Neil Mastin |
North Carolina Department of Transportation | 2011 | $20,000.00 | Kent Taylor | Neil Mastin |
North Carolina Department of Transportation | 2012 | $10,000.00 | Kent Taylor | Neil Mastin |
Wisconsin Department of Transportation | 2011 | $16,667.00 | Laura Fenley | Lynn Hanus |
Wisconsin Department of Transportation | 2012 | $16,667.00 | Laura Fenley | Lynn Hanus |
Wisconsin Department of Transportation | 2013 | $16,667.00 | Laura Fenley | Lynn Hanus |
Wisconsin Department of Transportation | 2014 | $16,667.00 | Laura Fenley | Lynn Hanus |
The Mechanistic Empirical Pavement Design Guide (MEPDG) is a significant advancement in pavement design, but requires significantly more inputs from designers. Many data sets need to be pre-processed before their use in the MEPDG procedure, such as Weigh-In-Motion (WIM) traffic data. Under contract with the Federal Highway Administration (FHWA) and the Office of Pavement Technology, and co-sponsored by the Arkansas Highway Department, the University of Arkansas recently developed a software program called PrepME with comprehensive database features to store and process climate, traffic and materials data and to: (1) identify all the required inputs and analysis parameters; (2) develop algorithms and procedures to locate the available data sets, pre-process raw data, check data quality, and import the traffic and other data sets to the designed database tables, including conducting quality checks on both weight and classification WIM data based on LTPP and FHWA methods; (3) implement database algorithms for uploading, data checking, and generating the required data files for the MEPDG software; and, (4) develop a user]friendly software interface, PrepME, to generate the required input files for the MEPDG software.
The objective of the PrepMEsoftware is to assist state DOTs in the data preparation and improve the management and workflow of the MEPDG input data to make the MEPDG software more accessible. Additionally, it can be used as a critical tool for calibrating and implementing the MEPDG as well.
In order to make PrepME full production software assist states use the MEPDG, the software and services need to be expanded to: (1) recognize the differences in loading patterns or traffic groups and estimate the full axle load spectrum data occurring under different conditions based on large amounts of WIM data, such as the LTPP data; (2) develop advanced algorithms to examine raw WIM data for quality and conduct data repair operations to salvage usable information in WIM data for MEPDG and other purposes. A portable version of quality checks for traffic data can be available to the field data collection crew; (3) Add more functions based on the consensus of participating states; (4) Customize PrepME for participating states; (5) Prepare and conduct training for the personnel of participating states; and, (6) Provide participating states technical support throughout the three year period.
It is estimated to cost $50,000 total for three years for a participating state. A minimum of ten states is desired. There are a number of other features in PrepME that may be useful to any highway agency, including (1) georeferencing of design sites, weather stations, WIM, and water table observations; (2) populating materials inputs for MEPDG; and (3) preparing other MEPDG inputs. It is envisioned that through this pooled fund study, a possible nationwide platform for data preparation of MEPDG can be established with guidelines and supports provided to individual states for implementation. Download current program: http://fhwa-pooled-fund.cveg.uark.edu/PrepME_for_Pooled-Fund_Study.zip LADOTD Technical contact: Doc Zhang, doc.zhang@la.gov
Title | File/Link | Document Category | Document Type | Privacy | Document Date | Download |
---|---|---|---|---|---|---|
TPF-5(242) Closeout Letter | TPF-5(242) Closeout Letter - Signed.pdf | Memorandum | Other | Public | 2017-12-19 | |
TPF-5(242) Closeout Funding Spreadsheet | TPF-5(242) Closeout Funding Spreadsheet.pdf | Other | Other | Public | 2017-12-12 | |
Technical Summary | http://www.ltrc.lsu.edu/pdf/2017/ts_582.pdf | TPF Study Documentation | Study Summary | Public | 2017-12-01 | |
Final Report | http://www.ltrc.lsu.edu/pdf/2017/FR_582.pdf | Deliverable | Final Report | Public | 2017-12-01 | |
Quarterly Report: April - June 2017 | 15-1PF_Quarterly Apr to Jun 2017.pdf | Progress Report | Quarterly Progress Report | Public | 2017-07-06 | |
Quarterly Report: January - March 2017 | 15-1PF_Quarterly Jan to Mar 2017.pdf | Progress Report | Quarterly Progress Report | Public | 2017-04-05 | |
Quarterly Report: October - December 2016 | TPF-5(242) Quarterly Report - October to December 2016.pdf | Progress Report | Quarterly Progress Report | Public | 2017-01-06 | |
Quarterly Report: July - September 2016 | TPF-5(242) Quarterly Report - July to Sep 2016.pdf | Progress Report | Quarterly Progress Report | Public | 2016-11-11 | |
Quarterly Report: January - March 2016 | TPF-5(242) Quarterly Report - Jan to Mar 2016.pdf | Progress Report | Quarterly Progress Report | Public | 2016-07-14 | |
Quarterly Report: April - June 2016 | TPF-5(242) Quarterly Report - Apr to June 2016.pdf | Progress Report | Quarterly Progress Report | Public | 2016-07-14 | |
Quarterly Report: October - December 2015 | TPF-5(242) Quarterly Report - Oct to Dec 2015.pdf | Progress Report | Quarterly Progress Report | Public | 2016-01-04 | |
Quarterly Report: July - September 2015 | TPF-5(242) Quarterly Report - Jul to Sep 2015.pdf | Progress Report | Quarterly Progress Report | Public | 2015-10-19 | |
Quarterly Report: April - June 2015 | TPF-5(242) Quarterly Report Form - Apr to Jun 2015.pdf | Progress Report | Quarterly Progress Report | Public | 2015-07-09 | |
Quarterly Report: January - March 2015 | TPF-5(242) Quarterly Report Form - Jan to Mar 2015.pdf | Progress Report | Quarterly Progress Report | Public | 2015-06-16 | |
Quarterly Report: October - December 2014 | TPF-5(242) Quarterly Report Form - Oct to Dec 2014.pdf | Progress Report | Quarterly Progress Report | Public | 2015-01-08 | |
Quarterly Report: July - September 2014 | TPF-5(242) Quarterly Report Form - Jul to Sep 2014.pdf | Progress Report | Quarterly Progress Report | Public | 2014-09-29 | |
Quarterly Report: April - June 2014 | TPF-5(242) Quarterly Report - Apr to Jun 2014.pdf | Progress Report | Quarterly Progress Report | Public | 2014-07-07 | |
Quarterly Report: January - March 2014 | TPF-5(242)Quarterly Report Form - Jan to Mar 2014.pdf | Progress Report | Quarterly Progress Report | Public | 2014-05-19 | |
Quarterly Report: October - December 2013 | TPF-5(242) Quarterly Report Form - Oct to Dec 2013.pdf | Progress Report | Quarterly Progress Report | Public | 2014-01-17 | |
Quarterly Report: July - September 2013 | TPF-5(242) Quarterly Report Form - July to Sep 2013.pdf | Progress Report | Quarterly Progress Report | Public | 2013-10-15 | |
Quarterly Report: April - June 2013 | TPF-5(242) Quarterly Report Form - April to June 2013.pdf | Progress Report | Quarterly Progress Report | Public | 2013-07-02 | |
Quarterly Report: January - March 2013 | TPF-5(242) Quarterly Report Form - Jan to Mar 2013.pdf | Progress Report | Quarterly Progress Report | Public | 2013-05-15 | |
Quarterly Report: October - December 2012 | TPF Quarterly Report Form - Oct to Dec 2012.pdf | Progress Report | Quarterly Progress Report | Public | 2013-04-08 | |
Quarterly Report: July - September 2012 | TPF-5(242) Quarterly Report Form - July to Sept 2012.pdf | Progress Report | Quarterly Progress Report | Public | 2012-10-29 | |
Quarterly Report: April - June 2012 | TPF Quarterly Report Form - Apr to Jun 2012.pdf | Progress Report | Quarterly Progress Report | Public | 2012-07-16 | |
Quarterly Report: January - March 2012 | TPF-5(242) Quarterly Report Form - Jan to Mar 2012.pdf | Progress Report | Quarterly Progress Report | Public | 2012-04-03 | |
Quarterly Report: October - December 2011 | TPF-5(242) Quarterly Report Form - Oct to Dec 2011.pdf | Progress Report | Quarterly Progress Report | Public | 2012-01-13 | |
Quarterly Report: July to September 2011 | TPF-5(242) Quarterly Report Form - July to Sept 2011.pdf | Progress Report | Quarterly Progress Report | Public | 2011-10-19 | |
Acceptance Memo | TPF5(242)_LA_Acceptance Memo.pdf | Memorandum | Other | Public | 2011-05-11 | |
Quarterly Report: April to June 2011 | TPF-5(242) Prep-ME QuarterlyReport - Apr 11- Jun 11.pdf | Progress Report | Quarterly Progress Report | Public | 2011-07-11 | |
Quarterly Report: January to March 2011 | http://pooledfund.org/documents/TPF-5_242/Prep-ME QuarterlyReport - Jan 11 - Mar 11.pdf | Progress Report | Quarterly Progress Report | Public | 2011-04-18 |
No document attached.
General Information |
|
Study Number: | TPF-5(242) |
Lead Organization: | Louisiana Department of Transportation and Development |
Contract Start Date: | Sep 01, 2011 |
Solicitation Number: | 1260 |
Partners: | HI, KY, LA, MDOT SHA, MI, NC, NHDOT, NV, WI |
Status: | Closed |
Est. Completion Date: | Aug 31, 2017 |
Contract/Other Number: | |
Last Updated: | Dec 12, 2017 |
Contract End Date: | Aug 31, 2017 |
Financial Summary |
|
Contract Amount: | $266,667.00 |
Total Commitments Received: | $436,668.00 |
100% SP&R Approval: |
Contact Information |
|||
Lead Study Contact(s): | Doc Zhang | ||
doc.zhang@la.gov | |||
Phone: 225-767-9162 | |||
FHWA Technical Liaison(s): | Mike Moravec | ||
Mike.Moravec@dot.gov | |||
Phone: 202-366-3982 |
Organization | Year | Commitments | Technical Contact Name | Funding Contact Name | Contact Number | Email Address |
---|---|---|---|---|---|---|
Hawaii Department of Transportation | 2011 | $50,000.00 | Casey Abe | Casey Abe | 808-832-3405 ext 223 | casey.abe@hawaii.gov |
Kentucky Transportation Cabinet | 2012 | $25,000.00 | Paul Looney | Jason Siwula | 502.782.5537 | jason.siwula@ky.gov |
Kentucky Transportation Cabinet | 2013 | $25,000.00 | Paul Looney | Jason Siwula | 502.782.5537 | jason.siwula@ky.gov |
Louisiana Department of Transportation and Development | 2011 | $25,000.00 | Doc Zhang | Tyson Rupnow | tyson.rupnow@la.gov | |
Louisiana Department of Transportation and Development | 2012 | $25,000.00 | Doc Zhang | Tyson Rupnow | tyson.rupnow@la.gov | |
Maryland Department of Transportation State Highway Administration | 2011 | $16,667.00 | Geoffrey Hall | Allison Hardt | 410-545-2916 | ahardt@mdot.maryland.gov |
Maryland Department of Transportation State Highway Administration | 2012 | $16,667.00 | Geoffrey Hall | Allison Hardt | 410-545-2916 | ahardt@mdot.maryland.gov |
Maryland Department of Transportation State Highway Administration | 2013 | $16,666.00 | Geoffrey Hall | Allison Hardt | 410-545-2916 | ahardt@mdot.maryland.gov |
Michigan Department of Transportation | 2012 | $0.00 | Michael Eacker | Andre' Clover | 517-749-9001 | clovera@michigan.gov |
Michigan Department of Transportation | 2013 | $25,000.00 | Michael Eacker | Andre' Clover | 517-749-9001 | clovera@michigan.gov |
Michigan Department of Transportation | 2014 | $25,000.00 | Michael Eacker | Andre' Clover | 517-749-9001 | clovera@michigan.gov |
Nevada Department of Transportation | 2016 | $10,000.00 | Yathi Vivekananthan | Ken Chambers | (775) 888-7220 | kchambers@dot.state.nv.us |
Nevada Department of Transportation | 2017 | $10,000.00 | Yathi Vivekananthan | Ken Chambers | (775) 888-7220 | kchambers@dot.state.nv.us |
New Hampshire Department of Transportation | 2011 | $20,000.00 | Robert Bollinger | Ann Scholz | 603-271-1659 | ann.scholz@dot.nh.gov |
New Hampshire Department of Transportation | 2012 | $20,000.00 | Robert Bollinger | Ann Scholz | 603-271-1659 | ann.scholz@dot.nh.gov |
New Hampshire Department of Transportation | 2013 | $10,000.00 | Robert Bollinger | Ann Scholz | 603-271-1659 | ann.scholz@dot.nh.gov |
North Carolina Department of Transportation | 2010 | $20,000.00 | Kent Taylor | Neil Mastin | 919 272 3706 | neil.mastin@mottmac.com |
North Carolina Department of Transportation | 2011 | $20,000.00 | Kent Taylor | Neil Mastin | 919 272 3706 | neil.mastin@mottmac.com |
North Carolina Department of Transportation | 2012 | $10,000.00 | Kent Taylor | Neil Mastin | 919 272 3706 | neil.mastin@mottmac.com |
Wisconsin Department of Transportation | 2011 | $16,667.00 | Laura Fenley | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2012 | $16,667.00 | Laura Fenley | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2013 | $16,667.00 | Laura Fenley | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2014 | $16,667.00 | Laura Fenley | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
The Mechanistic Empirical Pavement Design Guide (MEPDG) is a significant advancement in pavement design, but requires significantly more inputs from designers. Many data sets need to be pre-processed before their use in the MEPDG procedure, such as Weigh-In-Motion (WIM) traffic data. Under contract with the Federal Highway Administration (FHWA) and the Office of Pavement Technology, and co-sponsored by the Arkansas Highway Department, the University of Arkansas recently developed a software program called PrepME with comprehensive database features to store and process climate, traffic and materials data and to: (1) identify all the required inputs and analysis parameters; (2) develop algorithms and procedures to locate the available data sets, pre-process raw data, check data quality, and import the traffic and other data sets to the designed database tables, including conducting quality checks on both weight and classification WIM data based on LTPP and FHWA methods; (3) implement database algorithms for uploading, data checking, and generating the required data files for the MEPDG software; and, (4) develop a user]friendly software interface, PrepME, to generate the required input files for the MEPDG software.
The objective of the PrepMEsoftware is to assist state DOTs in the data preparation and improve the management and workflow of the MEPDG input data to make the MEPDG software more accessible. Additionally, it can be used as a critical tool for calibrating and implementing the MEPDG as well.
In order to make PrepME full production software assist states use the MEPDG, the software and services need to be expanded to: (1) recognize the differences in loading patterns or traffic groups and estimate the full axle load spectrum data occurring under different conditions based on large amounts of WIM data, such as the LTPP data; (2) develop advanced algorithms to examine raw WIM data for quality and conduct data repair operations to salvage usable information in WIM data for MEPDG and other purposes. A portable version of quality checks for traffic data can be available to the field data collection crew; (3) Add more functions based on the consensus of participating states; (4) Customize PrepME for participating states; (5) Prepare and conduct training for the personnel of participating states; and, (6) Provide participating states technical support throughout the three year period.
It is estimated to cost $50,000 total for three years for a participating state. A minimum of ten states is desired. There are a number of other features in PrepME that may be useful to any highway agency, including (1) georeferencing of design sites, weather stations, WIM, and water table observations; (2) populating materials inputs for MEPDG; and (3) preparing other MEPDG inputs. It is envisioned that through this pooled fund study, a possible nationwide platform for data preparation of MEPDG can be established with guidelines and supports provided to individual states for implementation. Download current program: http://fhwa-pooled-fund.cveg.uark.edu/PrepME_for_Pooled-Fund_Study.zip LADOTD Technical contact: Doc Zhang, doc.zhang@la.gov
Title | File/Link | Type | Private |
---|---|---|---|
TPF-5(242) Closeout Letter | TPF-5(242) Closeout Letter - Signed.pdf | Memorandum | Public |
TPF-5(242) Closeout Funding Spreadsheet | TPF-5(242) Closeout Funding Spreadsheet.pdf | Other | Public |
Final Report | Deliverable | Public | |
Technical Summary | TPF Study Documentation | Public | |
Quarterly Report: April - June 2017 | 15-1PF_Quarterly Apr to Jun 2017.pdf | Progress Report | Public |
Quarterly Report: January - March 2017 | 15-1PF_Quarterly Jan to Mar 2017.pdf | Progress Report | Public |
Quarterly Report: October - December 2016 | TPF-5(242) Quarterly Report - October to December 2016.pdf | Progress Report | Public |
Quarterly Report: July - September 2016 | TPF-5(242) Quarterly Report - July to Sep 2016.pdf | Progress Report | Public |
Quarterly Report: April - June 2016 | TPF-5(242) Quarterly Report - Apr to June 2016.pdf | Progress Report | Public |
Quarterly Report: January - March 2016 | TPF-5(242) Quarterly Report - Jan to Mar 2016.pdf | Progress Report | Public |
Quarterly Report: October - December 2015 | TPF-5(242) Quarterly Report - Oct to Dec 2015.pdf | Progress Report | Public |
Quarterly Report: July - September 2015 | TPF-5(242) Quarterly Report - Jul to Sep 2015.pdf | Progress Report | Public |
Quarterly Report: April - June 2015 | TPF-5(242) Quarterly Report Form - Apr to Jun 2015.pdf | Progress Report | Public |
Quarterly Report: January - March 2015 | TPF-5(242) Quarterly Report Form - Jan to Mar 2015.pdf | Progress Report | Public |
Quarterly Report: October - December 2014 | TPF-5(242) Quarterly Report Form - Oct to Dec 2014.pdf | Progress Report | Public |
Quarterly Report: July - September 2014 | TPF-5(242) Quarterly Report Form - Jul to Sep 2014.pdf | Progress Report | Public |
Quarterly Report: April - June 2014 | TPF-5(242) Quarterly Report - Apr to Jun 2014.pdf | Progress Report | Public |
Quarterly Report: January - March 2014 | TPF-5(242)Quarterly Report Form - Jan to Mar 2014.pdf | Progress Report | Public |
Quarterly Report: October - December 2013 | TPF-5(242) Quarterly Report Form - Oct to Dec 2013.pdf | Progress Report | Public |
Quarterly Report: July - September 2013 | TPF-5(242) Quarterly Report Form - July to Sep 2013.pdf | Progress Report | Public |
Quarterly Report: April - June 2013 | TPF-5(242) Quarterly Report Form - April to June 2013.pdf | Progress Report | Public |
Quarterly Report: January - March 2013 | TPF-5(242) Quarterly Report Form - Jan to Mar 2013.pdf | Progress Report | Public |
Quarterly Report: October - December 2012 | TPF Quarterly Report Form - Oct to Dec 2012.pdf | Progress Report | Public |
Quarterly Report: July - September 2012 | TPF-5(242) Quarterly Report Form - July to Sept 2012.pdf | Progress Report | Public |
Quarterly Report: April - June 2012 | TPF Quarterly Report Form - Apr to Jun 2012.pdf | Progress Report | Public |
Quarterly Report: January - March 2012 | TPF-5(242) Quarterly Report Form - Jan to Mar 2012.pdf | Progress Report | Public |
Quarterly Report: October - December 2011 | TPF-5(242) Quarterly Report Form - Oct to Dec 2011.pdf | Progress Report | Public |
Quarterly Report: July to September 2011 | TPF-5(242) Quarterly Report Form - July to Sept 2011.pdf | Progress Report | Public |
Quarterly Report: April to June 2011 | TPF-5(242) Prep-ME QuarterlyReport - Apr 11- Jun 11.pdf | Progress Report | Public |
Acceptance Memo | TPF5(242)_LA_Acceptance Memo.pdf | Memorandum | Public |
Quarterly Report: January to March 2011 | Progress Report | Public |