Development of Geotechnical Procedures/Operations Manual

Print
General Information
Study Number: TPF-5(076)
Former Study Number:
Lead Organization: Federal Highway Administration
Solicitation Number: 774
Partners: AR, CT, IADOT, ID, MS, MT, NC, OH, VT, WI
Status: Closed
Est. Completion Date:
Contract/Other Number: DTFH61-03-C-00127 and DTFH61-07-D-00007
Last Updated: May 30, 2013
Contract End Date:
Financial Summary
Contract Amount: $145,000.00
Suggested Contribution:
Total Commitments Received: $135,000.00
100% SP&R Approval: Approved
Contact Information
Lead Study Contact(s): Michael Adams
mike.adams@dot.gov
Phone: 202-493-3025
FHWA Technical Liaison(s): Michael Adams
mike.adams@dot.gov
Phone: 202-493-3025
Organization Year Commitments Technical Contact Name Funding Contact Name
Arkansas Department of Transportation 2005 $5,000.00 Mark Bradley
Connecticut Department of Transportation 2004 $5,000.00 Leo Fontaine James Sime
Connecticut Department of Transportation 2005 $5,000.00 Leo Fontaine James Sime
Idaho Department of Transportation 2004 $10,000.00 Tri Buu Amanda Laib
Idaho Department of Transportation 2005 $10,000.00 Tri Buu Amanda Laib
Iowa Department of Transportation 2004 $5,000.00 Bob Stanley Linda Narigon
Iowa Department of Transportation 2005 $5,000.00 Bob Stanley Linda Narigon
Mississippi Department of Transportation 2004 $5,000.00 James Williams James Watkins
Mississippi Department of Transportation 2005 $5,000.00 James Williams James Watkins
Montana Department of Transportation 2003 $5,000.00 Richard Jackson Susan Sillick
Montana Department of Transportation 2004 $5,000.00 Richard Jackson Susan Sillick
Montana Department of Transportation 2005 $5,000.00 Richard Jackson Susan Sillick
North Carolina Department of Transportation 2004 $12,500.00 Njoroge Wainaina Rodger Rochelle
North Carolina Department of Transportation 2005 $12,500.00 Njoroge Wainaina Rodger Rochelle
Ohio Department of Transportation 2004 $10,000.00 Gene Geiger Jill Martindale
Ohio Department of Transportation 2005 $10,000.00 Gene Geiger Jill Martindale
Vermont Agency of Transportation 2004 $5,000.00 Chris Benda Craig Graham
Vermont Agency of Transportation 2005 $5,000.00 Chris Benda Craig Graham
Wisconsin Department of Transportation 2004 $10,000.00 Robert Arndorfer Lori Richter

Study Description

This activity, identified in the Federal Highway Administration (FHWA) Geotechnical Tactical Roadmap as a high priority initiative, will develop a manual that will provide State DOTs with a standard for best practice. Currently, there are a number of State DOTs that have either outdated, incomplete or no procedures manuals for design, construction and inspection of geotechnical features (structural foundations, earth retaining structures and earthworks) for structures and roadway. In addition, with increasingly less geotechnical design work being done in-house, there is a need for a policy manual or procedural guideline that addresses the technical oversight of consultant project work. The development of national guidance in geotechnical procedures and operations will increase the probability of good design and construction practices and reduce the risk of construction claims and time delays, and additional project costs. This effort will be completed by a Contractor and will reference existing successful DOT in-house procedures manuals, management systems and available State and Federal Geotechnical publications. The web-enabled template will allow for continuous updating and improving of portions of the manual.

Objectives

To develop a manual that provides detailed technical guidance on Geotechnical procedures and selection, management, quality, and cost control of products/sercies from Geotechnical consultants and drillers. The project will also include development of a web enabled template with an implementation plan and a user interface application that will allow State Departments of Transportation (DOT) to adopt the manual in a form that is most suitable to their needs.

Scope of Work

In order to accomplish the objectives of this effort, the following tasks shall be accomplished: Task 1 - Information Gathering Conduct a comprehensive literature review including gathering existing procedures manuals, technical guidelines, and specifications from State DOTs and FHWA Direct Federal agency. The literature review will also include gathering pertinent technical publications from FHWA and other relevant sources. Task 2 - Outline/Bibliography Prepare a working Table of Contents for the proposed manual using information obtained in Task 1. As a minimum, the Table of Contents shall cover the follow broad subject titles: 1. Introduction/Purpose 2. Project Initiation/Scope of Study 3. Subsurface Investigations/Sampling 4. Soil and Rock Properties Determination 5. Scour/Hydraulics Considerations 6. Engineering Analysis/Design 7. Geotechnical Reporting 8. Guide for Specification Writing 9. Construction 10. Quality Assurance 11. Consultant Oversight As part of the oversight of consultant work, this effort will include an update of the FHWA publication Checklist and Guidelines for Review of Geotechnical Reports and Preliminary Plans and Specifications, reprinted in August 1988. In addition, there shall be an annotated bibliography of those references that will be used in developing the manual. Technical Note A team of technical specialists will be established to oversee the review the manual outline and drafts. The team will consist of focused group of geotechnical specialists selected from the participating State DOTs and FHWA. Comments and recommendations from reviewers will be submitted through the Technical Working Group (TWG) and FHWA Technical Liaison. Task 3 - 50% Draft Manual Prepare an initial draft consisting of a few key chapters of the manual for review by the Technical Working Group (TWG). The chapters that will be required under this task will be determined by the TWG during a kick-off meeting with the selected Contractor. The key chapters should be comprehensive including any photos, sketches, tables and graphics required for completeness. The initial draft manual will be prepared in dual units of measure, SI units presented first followed by English in parenthesis. Task 4 - Complete Draft Manual Prepare a comprehensive and practical manual providing technical guidance for design, construction and Consultant oversight of Geotechnical features including project initiation, subsurface investigations and sampling, laboratory testing and selection of design parameters, analysis and design procedures, reporting and specification writing, and construction quality assurance. Sufficient photos, sketches, tables and graphics should be included to assist highway engineers to understand the aspects of Geotechnical engineering. This task will also define flow and layout for the web based document. At this stage, the manual shall be in a format to allow reviewers to access documents on-line and follow working links to all pages. Task 5 - Final Draft Manual Revise the complete draft of the manual to reflect the TWGs review comments. The manual shall be web ready and the user interface and implementation plan will be complete. Upon completion of the manual, it is anticipated that a series of presentations will be made to project sponsors at the regional geotechnical conferences to introduce the document and provide user training.

Subjects: Soils, Geology, and Foundations

Documents Attached
Title File/Link Document Category Document Type Privacy Document Date Download
Official Closeout Memo TPF-5(076) -- Close out Memo - Electronic Signature LO.pdf Memorandum Other Public 2013-05-30
Quarterly Report: January 2005 quarterly_report_01-05.pdf Progress Report Quarterly Progress Report Public 2005-01-07
Documents Attached
Title File/Link Document Category Document Type Privacy Document Date Download
Development of Geotechnical Procedures/Operations Manual 774.pdf TPF Study Documentation Solicitation Public 2011-09-25

Development of Geotechnical Procedures/Operations Manual

General Information
Study Number: TPF-5(076)
Lead Organization: Federal Highway Administration
Solicitation Number: 774
Partners: AR, CT, IADOT, ID, MS, MT, NC, OH, VT, WI
Status: Closed
Est. Completion Date:
Contract/Other Number: DTFH61-03-C-00127 and DTFH61-07-D-00007
Last Updated: May 30, 2013
Contract End Date:
Financial Summary
Contract Amount: $145,000.00
Total Commitments Received: $135,000.00
100% SP&R Approval:
Contact Information
Lead Study Contact(s): Michael Adams
mike.adams@dot.gov
Phone: 202-493-3025
FHWA Technical Liaison(s): Michael Adams
mike.adams@dot.gov
Phone: 202-493-3025
Commitments by Organizations
Organization Year Commitments Technical Contact Name Funding Contact Name Contact Number Email Address
Arkansas Department of Transportation 2005 $5,000.00 Mark Bradley 501-569-2074 mark.bradley@arkansashighways.com
Connecticut Department of Transportation 2004 $5,000.00 Leo Fontaine James Sime 860-258-0309 james.sime@ct.gov
Connecticut Department of Transportation 2005 $5,000.00 Leo Fontaine James Sime 860-258-0309 james.sime@ct.gov
Idaho Department of Transportation 2004 $10,000.00 Tri Buu Amanda Laib 208-334-8181 amanda.laib@itd.idaho.gov
Idaho Department of Transportation 2005 $10,000.00 Tri Buu Amanda Laib 208-334-8181 amanda.laib@itd.idaho.gov
Iowa Department of Transportation 2004 $5,000.00 Bob Stanley Linda Narigon Linda.Narigon@iowadot.us
Iowa Department of Transportation 2005 $5,000.00 Bob Stanley Linda Narigon Linda.Narigon@iowadot.us
Mississippi Department of Transportation 2004 $5,000.00 James Williams James Watkins 601-359-7650 jwatkins@mdot.state.ms.us
Mississippi Department of Transportation 2005 $5,000.00 James Williams James Watkins 601-359-7650 jwatkins@mdot.state.ms.us
Montana Department of Transportation 2003 $5,000.00 Richard Jackson Susan Sillick 406-444-7693 ssillick@mt.gov
Montana Department of Transportation 2004 $5,000.00 Richard Jackson Susan Sillick 406-444-7693 ssillick@mt.gov
Montana Department of Transportation 2005 $5,000.00 Richard Jackson Susan Sillick 406-444-7693 ssillick@mt.gov
North Carolina Department of Transportation 2004 $12,500.00 Njoroge Wainaina Rodger Rochelle 919-715-4657 rdrochelle@dot.state.nc.us
North Carolina Department of Transportation 2005 $12,500.00 Njoroge Wainaina Rodger Rochelle 919-715-4657 rdrochelle@dot.state.nc.us
Ohio Department of Transportation 2004 $10,000.00 Gene Geiger Jill Martindale 6146448173 jacquelin.martindale@dot.ohio.gov
Ohio Department of Transportation 2005 $10,000.00 Gene Geiger Jill Martindale 6146448173 jacquelin.martindale@dot.ohio.gov
Vermont Agency of Transportation 2004 $5,000.00 Chris Benda Craig Graham 802-828-6920 craig.graham@state.vt.us
Vermont Agency of Transportation 2005 $5,000.00 Chris Benda Craig Graham 802-828-6920 craig.graham@state.vt.us
Wisconsin Department of Transportation 2004 $10,000.00 Robert Arndorfer Lori Richter 608-264-8435 lori.richter@dot.wi.gov

Study Description

Study Description

This activity, identified in the Federal Highway Administration (FHWA) Geotechnical Tactical Roadmap as a high priority initiative, will develop a manual that will provide State DOTs with a standard for best practice. Currently, there are a number of State DOTs that have either outdated, incomplete or no procedures manuals for design, construction and inspection of geotechnical features (structural foundations, earth retaining structures and earthworks) for structures and roadway. In addition, with increasingly less geotechnical design work being done in-house, there is a need for a policy manual or procedural guideline that addresses the technical oversight of consultant project work. The development of national guidance in geotechnical procedures and operations will increase the probability of good design and construction practices and reduce the risk of construction claims and time delays, and additional project costs. This effort will be completed by a Contractor and will reference existing successful DOT in-house procedures manuals, management systems and available State and Federal Geotechnical publications. The web-enabled template will allow for continuous updating and improving of portions of the manual.

Objectives

To develop a manual that provides detailed technical guidance on Geotechnical procedures and selection, management, quality, and cost control of products/sercies from Geotechnical consultants and drillers. The project will also include development of a web enabled template with an implementation plan and a user interface application that will allow State Departments of Transportation (DOT) to adopt the manual in a form that is most suitable to their needs.

Scope of Work

In order to accomplish the objectives of this effort, the following tasks shall be accomplished: Task 1 - Information Gathering Conduct a comprehensive literature review including gathering existing procedures manuals, technical guidelines, and specifications from State DOTs and FHWA Direct Federal agency. The literature review will also include gathering pertinent technical publications from FHWA and other relevant sources. Task 2 - Outline/Bibliography Prepare a working Table of Contents for the proposed manual using information obtained in Task 1. As a minimum, the Table of Contents shall cover the follow broad subject titles: 1. Introduction/Purpose 2. Project Initiation/Scope of Study 3. Subsurface Investigations/Sampling 4. Soil and Rock Properties Determination 5. Scour/Hydraulics Considerations 6. Engineering Analysis/Design 7. Geotechnical Reporting 8. Guide for Specification Writing 9. Construction 10. Quality Assurance 11. Consultant Oversight As part of the oversight of consultant work, this effort will include an update of the FHWA publication Checklist and Guidelines for Review of Geotechnical Reports and Preliminary Plans and Specifications, reprinted in August 1988. In addition, there shall be an annotated bibliography of those references that will be used in developing the manual. Technical Note A team of technical specialists will be established to oversee the review the manual outline and drafts. The team will consist of focused group of geotechnical specialists selected from the participating State DOTs and FHWA. Comments and recommendations from reviewers will be submitted through the Technical Working Group (TWG) and FHWA Technical Liaison. Task 3 - 50% Draft Manual Prepare an initial draft consisting of a few key chapters of the manual for review by the Technical Working Group (TWG). The chapters that will be required under this task will be determined by the TWG during a kick-off meeting with the selected Contractor. The key chapters should be comprehensive including any photos, sketches, tables and graphics required for completeness. The initial draft manual will be prepared in dual units of measure, SI units presented first followed by English in parenthesis. Task 4 - Complete Draft Manual Prepare a comprehensive and practical manual providing technical guidance for design, construction and Consultant oversight of Geotechnical features including project initiation, subsurface investigations and sampling, laboratory testing and selection of design parameters, analysis and design procedures, reporting and specification writing, and construction quality assurance. Sufficient photos, sketches, tables and graphics should be included to assist highway engineers to understand the aspects of Geotechnical engineering. This task will also define flow and layout for the web based document. At this stage, the manual shall be in a format to allow reviewers to access documents on-line and follow working links to all pages. Task 5 - Final Draft Manual Revise the complete draft of the manual to reflect the TWGs review comments. The manual shall be web ready and the user interface and implementation plan will be complete. Upon completion of the manual, it is anticipated that a series of presentations will be made to project sponsors at the regional geotechnical conferences to introduce the document and provide user training.

Subjects: Soils, Geology, and Foundations

Title File/Link Type Private
Official Closeout Memo TPF-5(076) -- Close out Memo - Electronic Signature LO.pdf Memorandum Public
Quarterly Report: January 2005 quarterly_report_01-05.pdf Progress Report Public
Title File/Link Type Private
Development of Geotechnical Procedures/Operations Manual 774.pdf TPF Study Documentation Public

Currently, Transportation Pooled Fund is not supported on mobile devices, please access this Web portal using a desktop or laptop computer.