Implementation of the 2002 AASHTO Design Guide for Pavement Structures

Print
General Information
Study Number: TPF-5(079)
Former Study Number:
Lead Organization: Kansas Department of Transportation
Contract Start Date: Oct 01, 2003
Solicitation Number: 768
Partners: KS, NY
Contractor(s): Kansas State University
Status: Closed
Est. Completion Date: Dec 31, 2015
Contract/Other Number:
Last Updated: Dec 08, 2017
Contract End Date: Sep 30, 2015
Financial Summary
Contract Amount: $609,963.00
Suggested Contribution:
Total Commitments Received: $562,000.00
100% SP&R Approval: Approved
Contact Information
Lead Study Contact(s): David Behzadpour
David.Behzadpour@ks.gov
Phone: 785-291-3847
Organization Year Commitments Technical Contact Name Funding Contact Name
Kansas Department of Transportation 2004 $62,000.00 Andrew Gisi Rodney Montney
New York State Department of Transportation 2003 $100,000.00 Wes Yang Gary Frederick
New York State Department of Transportation 2009 $200,000.00 Wes Yang Gary Frederick
New York State Department of Transportation 2010 $100,000.00 Wes Yang Gary Frederick
New York State Department of Transportation 2011 $0.00 Wes Yang Gary Frederick
New York State Department of Transportation 2012 $100,000.00 Wes Yang Gary Frederick

Objectives

The objective of this research is to develop the calibration procedure for the AASHTO 2002 design guide models for both flexible and rigid pavement structures for this region and to assist the state highway agencies in region in the implementation of the new Guide for pavement design and surface selection practices.

Scope of Work

It is envisioned that this study will be accomplished through the following tasks: 1. Literature Search - A literature search will be conducted to gather detailed information on the AASHTO 2002 design guide models, and all material and performance prediction models that it contains. Special consideration will be given to the models for characterization of pavement materials and soils and the corresponding material testing procedures. At the end of the literature search, based on the findings, a calibration plan will be developed in consultation with the state-selected Project Monitor (s). 2. Pavement Performance and Material Database: At this stage of the project, a database with representative material characterization and pavement condition data for participating states in the region will be built. The process will use data published in various state research reports, construction data as well as condition data available in the pavement management systems. The database will contain information only for several pavement sections considered representative of the roads in the participating states. The sections will be new as well as rehabilitated flexible and rigid pavements. 3. Analytical Model Calibration: In this task, the statistical analysis of the data assembled in the database will be performed. This task will also aim at the calibration factors for the following relationships: - layer material parameters used in the design model (e.g. stiffness, resilient modulus) and physical material characteristics (e.g. air voids, binder content, cement content). - traffic load spectra analysis and current capability of each agency to generate input for the calibration process. - pavement performance parameters (e.g. rutting, cracking, joint faulting) and stresses and strains at the corresponding critical locations in the pavement structures under different environmental conditions. The analysis will also include the study of the reliability of the new AASHTO design method to be applicable for the road conditions in the participating states when proposed calibration factors and material parameters are used. 4. Sensitivity Toward Surface Types Under Consideration- In this task, multiple runs of rigid and flexible pavement design methods will be done to determine the sensitivity of the input variables in the design process. 5. Life Cycle Cost (LCC) Analysis- The proposed LCC analysis module is quite extensive and needs a large number of inputs. In this task, the input needs and availability will be studied in details. The feasibility of developing default parameters for some inputs will also be investigated. 6. Reporting and Training - A final report will be prepared that will give detailed information on methodology and data used for the AASHTO 2002 model calibration. The report will include recommendations on the optimum use of the AASHTO model and life cycle cost analysis methodology as well as recommended default input values for the model parameters. Training of the participating agency pavement design personnel will be conducted to ease their work in understanding and using the model, and to better inform them on the calibration work and the supporting information.

Comments

Cost per state will be $62,000. The KSDOT has funded this research project at Kansas State University and is offering to serve as lead state in a pooled fund project that would allow surrounding states and other states in the region to share information and resources.

Subjects: Pavement Design, Management, and Performance

Documents Attached
Title File/Link Type Privacy Download
TPF-5(079) Closeout Letter TPF-5(079) Closeout Letter - Signed.pdf Memorandum Public
TPF-5(079) Clsoeout Funding Spreadsheet TPF-5(079) Closeout Funding Spreadsheet.pdf Other Public
Dev. of a Simplified Flexible Pvmt Design Protocol for New York State DOT Based on the AASHTO MEPDG Final Report Summary Dev. of a Simplified Flexible Pvmt Design Protocol for New York State DOT Based on the AASHTO MEPDG Study Summary Public
Dev. of a Simplified Flexible Pvmt Design Protocol for New York State DOT Based on the AASHTO MEPDG Dev. of a Simplified Flexible Pvmt Design Protocol for New York State DOT Based on the AASHTO MEPDG Final Report Public
Quarterly Report Sept 2016 SPR_quarterly_report_TPF-5(079)_9-30-16.pdf Quarterly Progress Report Public
June 2016 Quarterly Report SPR_quarterly_report_TPF-5(079)_6-30-16 (2).pdf Quarterly Progress Report Public
Quarterly Progress REport SPR_quarterly_report_TPF-5(079)_03-31-16.pdf Quarterly Progress Report Public
Quarterly Report Dec 2015 SPR_quarterly_report_TPF-5(079)_12-31-15.pdf Quarterly Progress Report Public
Quarterly Report Sept 2015 SPR_quarterly_report_TPF-5(079)_9-30-15 (2).pdf Quarterly Progress Report Public
Quarterly Report June 2015 SPR_quarterly_report_TPF-5(079)_6-30-15.pdf Quarterly Progress Report Public
Quarterly Report march 2015 SPR_quarterly_report_TPF-5(079)_3-31-15.pdf Quarterly Progress Report Public
Quarterly Report Dec 2014 SPR_quarterly_report_TPF-5(079)_12-31-14.pdf Quarterly Progress Report Public
Quarterly Report Sept 2014 SPR_quarterly_report_TPF-5(079)_9-30-14.pdf Quarterly Progress Report Public
Quarterly REport June 2014 SPR_quarterly_report_TPF-5(079)_6-30-14.pdf Quarterly Progress Report Public
Quarterly Report March 2014 SPR_quarterly_report_TPF-5(079)_3-31-14 (2).pdf Quarterly Progress Report Public
Quarterly Report Dec 2013 SPR_quarterly_report_TPF-5(079)_12-31-13.pdf Quarterly Progress Report Public
Quarterly Report September 2013 SPR_quarterly_report_TPF-5(079)_9-30-13 (2).pdf Quarterly Progress Report Public
Quarterly Report June 2013 SPR_quarterly_report_TPF-5(079)_6-30-13 (2).pdf Quarterly Progress Report Public
Quarterly Report for Period ending 3/31/13 SPR_quarterly_report_TPF-5(079)_3-31-13.pdf Quarterly Progress Report Public
Sept 2012 Quarterly Report SPR_quarterly_report_TPF-5(127) 9-30-12.docx Quarterly Progress Report Public
Quarterly Report June 2012 SPR_quarterly_report_TPF-5(079)_6-30-12.pdf Quarterly Progress Report Public
Quarterly Report for Period ending 3/31/2012 SPR_quarterly_report_TPF-5(079) 3-31-12.pdf Quarterly Progress Report Public
Quarterly Report for period ending 12/31/2011 SPR_quarterly_report_TPF-5(079) 12-31-11.pdf Quarterly Progress Report Public
Quarterly Report for Period ending 9/30/2011 SPR_quarterly_report_TPF-5(079) 9-30-11.pdf Annual Report Public
Funding Spread Sheet Oct 2011 TPF-5(079) Funding Spreadsheet.pdf Other Public
Quarterly Report for the period ending 3/31/2011 SPR_quarterly_report_TPF-5(079) 3-31-11.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 6/30/11 qtrly_rpt_06-30-11.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 12/31/10 SPR_quarterly_report_TPF-5(079) 2-31-10-1.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 03/31/2010 quarterly_report_3-31-10.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 6/30/10 SPR_quarterly_report_TPF-5(079)_6-30-10.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 12/31/09 qtrly_rpt_12-31-09.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 9/30/09 qtrly_rpt_09-30-09.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 6/30/09 qtrly_rpt_06-30-09.pdf Quarterly Progress Report Public
Supplemental Agreement No. 4--12/8/2009 Supplemental_agreement4.pdf Other Public
Quarterly Report for the period ending 9/30/08 qtrly_rpt_09-30-08.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 3/31/09 qtrly_rpt_03-31-09.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 12/31/08 qtrly_rpt_12-31-08.pdf Quarterly Progress Report Public
Final Report (K-TRAN: KSU-04-4, November 2008) - ***Note: This Final Report Relates to KDOT Work for Project KSU-04-4_FinalReport.pdf Final Report Public
Supplemental Agreement No. 3--11/15/2006 Supplemental_agreement3.pdf Other Public
Supplemental Agreement No. 1--03/12/2005 Supplemental_agreement1.pdf Other Public
Supplemental Agreement No. 2--02/27/2006 Supplemental_agreement2.pdf Other Public
Lead State Acceptance Letter Lead_State_Acceptance_Letter.pdf Memorandum Public
Quarterly Report for the period ending 3/31/08 qtrly_rpt_03-31-08.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 12/31/07 qtrly_rpt_12-31-07.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 6/30/08 qtrly_rpt_06-30-08.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 9/30/06 qtrly_rpt_09-30-06.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 9/30/2007 qtrly_rpt_09-30-07.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 6/30/07 qtrly_rpt_06-30-07.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 03/31/07 qtrly_rpt_03-31-07.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 12/31/06 qtrly_rpt_12-31-06.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 3/31/06 qtrly_rpt_03-31-06.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 12/31/05 qtrly_rpt_12-31-05.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 9/30/05 qtrly_rpt_09-30-05.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 6/30/06 qtrly_rpt_06-30-06.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 12/31/04 qtrly_rpt_12-31-04.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 9/30/04 qtrly_rpt_09-30-04.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 6/30/04 qtrly_rpt_06-30-04.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 12/31/03 qtrly_rpt_12-31-03.pdf Quarterly Progress Report Public
Work Plan - September 2003 work_plan_09-04-03.pdf Work Plan Public
Quarterly Report for the period ending 3/31/05 qtrly_rpt_03-31-05.pdf Quarterly Progress Report Public
Documents Attached
Title File/Link Type Privacy Download
Implementation of the 2002 AASHTO Design Guide for Pavement Structures 768.pdf Solicitation Public

Implementation of the 2002 AASHTO Design Guide for Pavement Structures

General Information
Study Number: TPF-5(079)
Lead Organization: Kansas Department of Transportation
Contract Start Date: Oct 01, 2003
Solicitation Number: 768
Partners: KS, NY
Contractor(s): Kansas State University
Status: Closed
Est. Completion Date: Dec 31, 2015
Contract/Other Number:
Last Updated: Dec 08, 2017
Contract End Date: Sep 30, 2015
Financial Summary
Contract Amount: $609,963.00
Total Commitments Received: $562,000.00
100% SP&R Approval:
Contact Information
Lead Study Contact(s): David Behzadpour
David.Behzadpour@ks.gov
Phone: 785-291-3847
Commitments by Organizations
Organization Year Commitments Technical Contact Name Funding Contact Name Contact Number Email Address
Kansas Department of Transportation 2004 $62,000.00 Andrew Gisi Rodney Montney 785-291-3844 rodney@ksdot.org
New York State Department of Transportation 2003 $100,000.00 Wes Yang Gary Frederick 518-457-4645 gary.frederick@dot.ny.gov
New York State Department of Transportation 2009 $200,000.00 Wes Yang Gary Frederick 518-457-4645 gary.frederick@dot.ny.gov
New York State Department of Transportation 2010 $100,000.00 Wes Yang Gary Frederick 518-457-4645 gary.frederick@dot.ny.gov
New York State Department of Transportation 2011 $0.00 Wes Yang Gary Frederick 518-457-4645 gary.frederick@dot.ny.gov
New York State Department of Transportation 2012 $100,000.00 Wes Yang Gary Frederick 518-457-4645 gary.frederick@dot.ny.gov

Study Description

Objectives

The objective of this research is to develop the calibration procedure for the AASHTO 2002 design guide models for both flexible and rigid pavement structures for this region and to assist the state highway agencies in region in the implementation of the new Guide for pavement design and surface selection practices.

Scope of Work

It is envisioned that this study will be accomplished through the following tasks: 1. Literature Search - A literature search will be conducted to gather detailed information on the AASHTO 2002 design guide models, and all material and performance prediction models that it contains. Special consideration will be given to the models for characterization of pavement materials and soils and the corresponding material testing procedures. At the end of the literature search, based on the findings, a calibration plan will be developed in consultation with the state-selected Project Monitor (s). 2. Pavement Performance and Material Database: At this stage of the project, a database with representative material characterization and pavement condition data for participating states in the region will be built. The process will use data published in various state research reports, construction data as well as condition data available in the pavement management systems. The database will contain information only for several pavement sections considered representative of the roads in the participating states. The sections will be new as well as rehabilitated flexible and rigid pavements. 3. Analytical Model Calibration: In this task, the statistical analysis of the data assembled in the database will be performed. This task will also aim at the calibration factors for the following relationships: - layer material parameters used in the design model (e.g. stiffness, resilient modulus) and physical material characteristics (e.g. air voids, binder content, cement content). - traffic load spectra analysis and current capability of each agency to generate input for the calibration process. - pavement performance parameters (e.g. rutting, cracking, joint faulting) and stresses and strains at the corresponding critical locations in the pavement structures under different environmental conditions. The analysis will also include the study of the reliability of the new AASHTO design method to be applicable for the road conditions in the participating states when proposed calibration factors and material parameters are used. 4. Sensitivity Toward Surface Types Under Consideration- In this task, multiple runs of rigid and flexible pavement design methods will be done to determine the sensitivity of the input variables in the design process. 5. Life Cycle Cost (LCC) Analysis- The proposed LCC analysis module is quite extensive and needs a large number of inputs. In this task, the input needs and availability will be studied in details. The feasibility of developing default parameters for some inputs will also be investigated. 6. Reporting and Training - A final report will be prepared that will give detailed information on methodology and data used for the AASHTO 2002 model calibration. The report will include recommendations on the optimum use of the AASHTO model and life cycle cost analysis methodology as well as recommended default input values for the model parameters. Training of the participating agency pavement design personnel will be conducted to ease their work in understanding and using the model, and to better inform them on the calibration work and the supporting information.

Comments

Cost per state will be $62,000. The KSDOT has funded this research project at Kansas State University and is offering to serve as lead state in a pooled fund project that would allow surrounding states and other states in the region to share information and resources.

Subjects: Pavement Design, Management, and Performance

Title File/Link Type Private
Quarterly Report for Period ending 9/30/2011 SPR_quarterly_report_TPF-5(079) 9-30-11.pdf Annual Report Public
Final Report (K-TRAN: KSU-04-4, November 2008) - ***Note: This Final Report Relates to KDOT Work for Project KSU-04-4_FinalReport.pdf Final Report Public
Dev. of a Simplified Flexible Pvmt Design Protocol for New York State DOT Based on the AASHTO MEPDG Dev. of a Simplified Flexible Pvmt Design Protocol for New York State DOT Based on the AASHTO MEPDG Final Report Public
Lead State Acceptance Letter Lead_State_Acceptance_Letter.pdf Memorandum Public
TPF-5(079) Closeout Letter TPF-5(079) Closeout Letter - Signed.pdf Memorandum Public
Supplemental Agreement No. 2--02/27/2006 Supplemental_agreement2.pdf Other Public
Supplemental Agreement No. 1--03/12/2005 Supplemental_agreement1.pdf Other Public
Supplemental Agreement No. 3--11/15/2006 Supplemental_agreement3.pdf Other Public
Supplemental Agreement No. 4--12/8/2009 Supplemental_agreement4.pdf Other Public
Funding Spread Sheet Oct 2011 TPF-5(079) Funding Spreadsheet.pdf Other Public
TPF-5(079) Clsoeout Funding Spreadsheet TPF-5(079) Closeout Funding Spreadsheet.pdf Other Public
Quarterly Report for the period ending 12/31/03 qtrly_rpt_12-31-03.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 6/30/04 qtrly_rpt_06-30-04.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 9/30/04 qtrly_rpt_09-30-04.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 12/31/04 qtrly_rpt_12-31-04.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 3/31/05 qtrly_rpt_03-31-05.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 9/30/05 qtrly_rpt_09-30-05.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 12/31/05 qtrly_rpt_12-31-05.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 3/31/06 qtrly_rpt_03-31-06.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 6/30/06 qtrly_rpt_06-30-06.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 9/30/06 qtrly_rpt_09-30-06.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 12/31/06 qtrly_rpt_12-31-06.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 03/31/07 qtrly_rpt_03-31-07.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 6/30/07 qtrly_rpt_06-30-07.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 9/30/2007 qtrly_rpt_09-30-07.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 12/31/07 qtrly_rpt_12-31-07.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 3/31/08 qtrly_rpt_03-31-08.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 6/30/08 qtrly_rpt_06-30-08.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 9/30/08 qtrly_rpt_09-30-08.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 12/31/08 qtrly_rpt_12-31-08.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 3/31/09 qtrly_rpt_03-31-09.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 6/30/09 qtrly_rpt_06-30-09.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 9/30/09 qtrly_rpt_09-30-09.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 12/31/09 qtrly_rpt_12-31-09.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 03/31/2010 quarterly_report_3-31-10.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 6/30/10 SPR_quarterly_report_TPF-5(079)_6-30-10.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 12/31/10 SPR_quarterly_report_TPF-5(079) 2-31-10-1.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 3/31/2011 SPR_quarterly_report_TPF-5(079) 3-31-11.pdf Quarterly Progress Report Public
Quarterly Report for the period ending 6/30/11 qtrly_rpt_06-30-11.pdf Quarterly Progress Report Public
Quarterly Report for period ending 12/31/2011 SPR_quarterly_report_TPF-5(079) 12-31-11.pdf Quarterly Progress Report Public
Quarterly Report for Period ending 3/31/2012 SPR_quarterly_report_TPF-5(079) 3-31-12.pdf Quarterly Progress Report Public
Quarterly Report June 2012 SPR_quarterly_report_TPF-5(079)_6-30-12.pdf Quarterly Progress Report Public
Sept 2012 Quarterly Report SPR_quarterly_report_TPF-5(127) 9-30-12.docx Quarterly Progress Report Public
Quarterly Report for Period ending 3/31/13 SPR_quarterly_report_TPF-5(079)_3-31-13.pdf Quarterly Progress Report Public
Quarterly Report June 2013 SPR_quarterly_report_TPF-5(079)_6-30-13 (2).pdf Quarterly Progress Report Public
Quarterly Report September 2013 SPR_quarterly_report_TPF-5(079)_9-30-13 (2).pdf Quarterly Progress Report Public
Quarterly Report Dec 2013 SPR_quarterly_report_TPF-5(079)_12-31-13.pdf Quarterly Progress Report Public
Quarterly Report March 2014 SPR_quarterly_report_TPF-5(079)_3-31-14 (2).pdf Quarterly Progress Report Public
Quarterly REport June 2014 SPR_quarterly_report_TPF-5(079)_6-30-14.pdf Quarterly Progress Report Public
Quarterly Report Sept 2014 SPR_quarterly_report_TPF-5(079)_9-30-14.pdf Quarterly Progress Report Public
Quarterly Report Dec 2014 SPR_quarterly_report_TPF-5(079)_12-31-14.pdf Quarterly Progress Report Public
Quarterly Report march 2015 SPR_quarterly_report_TPF-5(079)_3-31-15.pdf Quarterly Progress Report Public
Quarterly Report June 2015 SPR_quarterly_report_TPF-5(079)_6-30-15.pdf Quarterly Progress Report Public
Quarterly Report Sept 2015 SPR_quarterly_report_TPF-5(079)_9-30-15 (2).pdf Quarterly Progress Report Public
Quarterly Report Dec 2015 SPR_quarterly_report_TPF-5(079)_12-31-15.pdf Quarterly Progress Report Public
Quarterly Progress REport SPR_quarterly_report_TPF-5(079)_03-31-16.pdf Quarterly Progress Report Public
June 2016 Quarterly Report SPR_quarterly_report_TPF-5(079)_6-30-16 (2).pdf Quarterly Progress Report Public
Quarterly Report Sept 2016 SPR_quarterly_report_TPF-5(079)_9-30-16.pdf Quarterly Progress Report Public
Dev. of a Simplified Flexible Pvmt Design Protocol for New York State DOT Based on the AASHTO MEPDG Final Report Summary Dev. of a Simplified Flexible Pvmt Design Protocol for New York State DOT Based on the AASHTO MEPDG Study Summary Public
Work Plan - September 2003 work_plan_09-04-03.pdf Work Plan Public
Title File/Link Type Private
Implementation of the 2002 AASHTO Design Guide for Pavement Structures 768.pdf Solicitation Public

Currently, Transportation Pooled Fund is not supported on mobile devices, please access this Web portal using a desktop or laptop computer.