Financial Summary |
|
Contract Amount: | $0.00 |
Suggested Contribution: | |
Total Commitments Received: | $680,000.00 |
100% SP&R Approval: | Approved |
Contact Information |
|||
Lead Study Contact(s): | Leni Oman | ||
OmanL@wsdot.wa.gov | |||
Phone: 360-705-7974 |
Organization | Year | Commitments | Technical Contact Name | Funding Contact Name |
---|---|---|---|---|
Alaska Department of Transportation and Public Facilities | 0 | $0.00 | Mark Miles | Clint Adler |
Alaska Department of Transportation and Public Facilities | 2004 | $60,000.00 | Mark Miles | Clint Adler |
California Department of Transportation | 2004 | $500,000.00 | Sang Le | |
California Department of Transportation | 2006 | $105,000.00 | Sang Le | |
Oregon Department of Transportation | 2005 | $15,000.00 | Barnie Jones | |
Washington State Department of Transportation | 0 | $0.00 | Paul Wagner |
To measure fish passage success by designing a flume that has the capability for testing several bed treatments and several turbulence and velocity variables. This flume will be used to test existing and new bed configurations and treatments, and to optimize successful configurations. The flume needs to be designed to allow accuracy in scaling and instrumented with observational (video) turbulence and velocity equipment.
Construction of the test flume has been completed as well as the initial base line testing. (updated: 10/16/03)
Subjects: Bridges, Other Structures, and Hydraulics and Hydrology Energy and Environment
General Information |
|
Study Number: | SPR-3(096) |
Lead Organization: | Washington State Department of Transportation |
Solicitation Number: | 862 |
Partners: | AK, CA, OR, WA |
Contractor(s): | Battelle |
Status: | Closed |
Est. Completion Date: | |
Contract/Other Number: | |
Last Updated: | Aug 04, 2009 |
Contract End Date: |
Financial Summary |
|
Contract Amount: | $0.00 |
Total Commitments Received: | $680,000.00 |
100% SP&R Approval: |
Contact Information |
|||
Lead Study Contact(s): | Leni Oman | ||
OmanL@wsdot.wa.gov | |||
Phone: 360-705-7974 |
Organization | Year | Commitments | Technical Contact Name | Funding Contact Name | Contact Number | Email Address |
---|---|---|---|---|---|---|
Alaska Department of Transportation and Public Facilities | 0 | $0.00 | Mark Miles | Clint Adler | 907-451-5321 | clint.adler@alaska.gov |
Alaska Department of Transportation and Public Facilities | 2004 | $60,000.00 | Mark Miles | Clint Adler | 907-451-5321 | clint.adler@alaska.gov |
California Department of Transportation | 2004 | $500,000.00 | Sang Le | (916)701-3998 | sang.le@dot.ca.gov | |
California Department of Transportation | 2006 | $105,000.00 | Sang Le | (916)701-3998 | sang.le@dot.ca.gov | |
Oregon Department of Transportation | 2005 | $15,000.00 | Barnie Jones | 503- 986-2845 | barnie.p.jones@odot.state.or.us | |
Washington State Department of Transportation | 0 | $0.00 | Paul Wagner |
To measure fish passage success by designing a flume that has the capability for testing several bed treatments and several turbulence and velocity variables. This flume will be used to test existing and new bed configurations and treatments, and to optimize successful configurations. The flume needs to be designed to allow accuracy in scaling and instrumented with observational (video) turbulence and velocity equipment.
Construction of the test flume has been completed as well as the initial base line testing. (updated: 10/16/03)
Subjects: Bridges, Other Structures, and Hydraulics and Hydrology Energy and Environment
Title | File/Link | Type | Private |
---|---|---|---|
Progress Report: December 2006 | quarterly_report_2006-12-31.pdf | Progress Report | Public |
Progress Report, January - June 2006 | quarterly_report_2006-06-30.pdf | Progress Report | Public |
June 2005 through March 2006 | quarterly_report_03-06.pdf | Progress Report | Public |
January 2005 through June 2005 | quarterly_report_06-05.pdf | Progress Report | Public |
July 1, 2004 through December 31, 2004 | quarterly_report_12-04.pdf | Progress Report | Public |
Culvert Testing Program for Juvenile Salmonid Passage (January - June 2003) | quarterly_report_06-03.pdf | Progress Report | Public |
Progress Report, 4th Quarter 2002 | quarterly_report_01-02.pdf | Progress Report | Public |
Title | File/Link | Type | Private |
---|---|---|---|
Testing Fish Passage Through Culverts | 862.pdf | TPF Study Documentation | Public |