Financial Summary |
|
| Suggested Contribution: | |
| Commitment Start Year: | 2002 |
| Commitment End Year: | 2006 |
| 100% SP&R Approval: | Not Requested |
| Commitments Required: | $61,112.00 |
| Commitments Received: | $61,112.00 |
| Estimated Duration Month: | 48 |
| Waiver Requested: | No |
Contact Information |
|
| Lead Study Contact(s): | Jean Landolt |
| Jean.Landolt@dot.gov | |
| FHWA Technical Liaison(s): | Sterling Jones |
| sterling.jones@dot.gov | |
| Phone: 202-493-3043 | |
| Organization | Year | Commitments | Technical Contact Name | Funding Contact Name | Contact Number | Email Address |
|---|---|---|---|---|---|---|
| Maryland Department of Transportation State Highway Administration | 2002 | $61,112.00 | Andy Kosicki | Allison Hardt | 410-545-2916 | ahardt@mdot.maryland.gov |
To extend previous research done at the FHWA's Hydraulics Research Laboratory on the hydraulic performance of bottomless culverts.
This study will focus on three hydraulic attributes for bottomless culverts: * Fixed bed tests will be conducted to measure pre-scour conditions, which are the basis for the methodology proposed in the earlier study to preduct scour. * Submerged entrance conditions will be tested for both fixed bed and moveable bed conditions. * Entrance loss coefficients will be determined for prescour and scoured conditions. * Design coefficients for riprap stability at the culvert entrance will be evaluated and reavised as necessary. * Cross vanes near the culvert entrance, in the approach flow will be tested as a countermeasure for culvert scour. Detailed velocity distributions will be measured at the culvert entrance using advanced techniques to test assumptions made in GKY&A's and MD DOT methodologies.
No document attached.
General Information |
|
| Solicitation Number: | 237 |
| Status: | End Solicitation Phase |
| Date Posted: | Jul 01, 2002 |
| Last Updated: | Oct 18, 2004 |
| Solicitation Expires: | |
| Partners: | MDOT SHA |
| Lead Organization: | Federal Highway Administration |
Financial Summary |
|
| Suggested Contribution: | |
| Commitment Start Year: | 2002 |
| Commitment End Year: | 2006 |
| 100% SP&R Approval: | Not Requested |
| Commitments Required: | $61,112.00 |
| Commitments Received: | $61,112.00 |
Contact Information |
|
| Lead Study Contact(s): | Jean Landolt |
| Jean.Landolt@dot.gov | |
| FHWA Technical Liaison(s): | Sterling Jones |
| sterling.jones@dot.gov | |
| Phone: 202-493-3043 | |
| Agency | Year | Commitments | Technical Contact Name | Funding Contact Name | Contact Number | Email Address |
|---|---|---|---|---|---|---|
| Maryland Department of Transportation State Highway Administration | 2002 | $61,112.00 | Andy Kosicki | Allison Hardt | 410-545-2916 | ahardt@mdot.maryland.gov |
To extend previous research done at the FHWA's Hydraulics Research Laboratory on the hydraulic performance of bottomless culverts.
This study will focus on three hydraulic attributes for bottomless culverts: * Fixed bed tests will be conducted to measure pre-scour conditions, which are the basis for the methodology proposed in the earlier study to preduct scour. * Submerged entrance conditions will be tested for both fixed bed and moveable bed conditions. * Entrance loss coefficients will be determined for prescour and scoured conditions. * Design coefficients for riprap stability at the culvert entrance will be evaluated and reavised as necessary. * Cross vanes near the culvert entrance, in the approach flow will be tested as a countermeasure for culvert scour. Detailed velocity distributions will be measured at the culvert entrance using advanced techniques to test assumptions made in GKY&A's and MD DOT methodologies.