General Information |
|
| Solicitation Number: | 1672 |
| Former Study Number: | |
| Status: | Solicitation posted |
| Date Posted: | Nov 06, 2026 |
| Last Updated: | Nov 06, 2026 |
| Solicitation Expires: | Nov 06, 2027 |
| Lead Organization: | Alabama Department of Transportation |
Financial Summary |
|
| Suggested Yearly Contribution: | |
| Commitment Start Year: | 2027 |
| Commitment End Year: | 2030 |
| 100% SP&R Approval: | Not Requested |
| Commitments Required: | $6,800,000.00 |
| Commitments Received: | |
| Estimated Duration Month: | 48 |
| Waiver Requested: | Yes |
Contact Information |
|
| Lead Study Contact(s): | Kidada Dixon |
| dixonk@dot.state.al.us | |
| Study Champion(s): | Scott George |
| georges@dot.state.al.us | |
| Phone: 334-206-2201 | |
| Organization | Year | Commitments | Technical Contact Name | Funding Contact Name | Contact Number | Email Address |
|---|
The NCAT Pavement Test Track was originally
constructed as a result of interest and support from state Departments of
Transportation (DOTs) who shared a concern for building and preserving safe,
sustainable, resilient, and cost-effective pavement infrastructure. Track
research operations began in the summer of 2000. Forty-six 200-ft test sections
were subjected to 10 million equivalent single axle loadings (ESALs) of heavy
truck traffic through December of 2002.
Test sections were rebuilt in 2003, 2006, 2009, 2012, 2015, 2018, 2021, and
2024 with 10 million ESALs applied within each 3-year research cycle. NCAT
began formally partnering with the MnROAD in 2015 to execute nationally
relevant research in both mix performance testing and pavement preservation.
Positive experiences with implementable findings that reduce the life cycle
cost of flexible pavements and facilitate rapid deployment of sustainable
technologies have made this research an outstanding investment for numerous
state DOTS who pool their resources to share the cost of construction,
operations, and research in a cooperative manner. The summer 2027 rebuild is the
starting point for the nineth research cycle, with many high reward research
options available for potential sponsors.
NCAT is again partnering with MnROAD in the 2027 research cycle to
execute a pavement performance experiment with nationwide implementation
impact.
The primary objectives of the
pooled fund project described herein will be: (1) constructing, maintaining and
and/or rebuilding experimental pavements on the existing 1.7-mile NCAT test
oval and the Minnesota Road Research Project (MnROAD) mainline bypass that are
representative of in-service roadways on the open transportation
infrastructure; (2) applying accelerated performance truck traffic after
construction for the duration of the 3-year research cycle; (3)
assessing/comparing the functional and structural field performance of
trafficked sections on a regular basis via surface and subsurface measures; (4)
validating /calibrating new and existing methodologies for analysis and design
using pavement surface condition, pavement load response, precise traffic and
environmental logging, and cumulative damage; (5) correlating field results
with laboratory data for both mix and structural performance; and (6) answering
practical questions posed by research sponsors through formal (i.e., reports and
technical papers) and informal (e.g., one-on-one responses to sponsor
inquiries) technology transfer.
The scope of work for the
pooled fund project will include: (1) hauling materials to the project from
offsite locations. Material donations are typically secured by state sponsors,
while reasonable hauling expenses are handled by the pooled fund; (2)
rebuilding sections in accordance with sponsors’ directives via competitively
bid subcontracts administered by NCAT. It
is anticipated that aggregate hauling, liquid asphalt supply and delivery,
rental of select construction equipment, plant production, and mix placement
may all be procured via competitively bid subcontracts; (3) installing both
environmental (i.e., multi-depth pavement temperature probes) and/or response
instrumentation (i.e., high speed stress and strain gages) in experimental
sections; (4) operating a 5-truck heavy triple-trailer fleet in order to apply
accelerated truck traffic on the NCAT test oval following the completion of
construction. Human drivers operate NCAT vehicles in order to best induce
representative vehicle wander, but it is expected that autonomous vehicles will
be implemented in the future. Diverted interstate traffic is used to load test
sections at MnROAD; (5) safely measuring field performance (e.g., rutting,
roughness, texture, cracking, deflection, friction, etc.) on a regular basis
when traffic is suspended/bypassed to fully document changes in surface
condition as a function of traffic and temperature. High-speed pavement
response is also measured on a routine basis; (6) conducting laboratory testing
on quantify basic material and mix performance properties, which will serve as
the basis of performance model development; and (7) comparing predicted and
measured pavement response as well as predicted and measured cumulative
pavement damage in order to validate then calibrate prevailing analysis and
design methodologies.
This project is expected to be eligible
for 100% State Planning and Research (SPR) funding. Each sponsor participating
in the study is asked to contribute funding as a function of the scope of their
selected research. NCAT also encourages
sponsors to consider partnering with others in group experiments designed to
meet their most pressing shared priorities.
The following summarizes the research section options and associated
annual costs for FY2027 through FY2029: (1) Structural Performance: $300,000
per existing structural section per year for 3 years for a total of $900,000;
(2) Mill and Inlay for Surface Performance: $200,000 per new mill/inlay
section per year for 3 years for a total of $600,000; (3) NextPAVE Challenge*:$250,000 per sponsor per year for 3 years for a total of $750,000; (4) Non-Structural
Continuation - also surface treatments on existing sections: $110,000 per
existing perpetual section per year for 3 years for a total of $330,000; (5) Structural
Continuation – also surface treatments on existing sections: $126,667 per
existing section per year for 3 years for a total of $380,000; (6) Off-Ramp
Performance:$100,000 per existing off-ramp section per year for 3
years (FY2027-FY2029) for a total of $300,000; (7) Off-Ramp Continuation:
$40,000 per existing off-ramp section per year for 3 years for a total of
$120,000; and/or (8) Split Sub-Section Experiments – also surface
treatments on existing sections: $30,000 per sub-section per year for 3 years
for a total of $90,000.
Funding requirements are based on reasonable assumptions; however, if project costs increase unexpectedly (i.e., fuel) a proportionate amount of additional funding or a reduced scope of work may be required. All items purchased through the pooled fund for the execution of this study (regardless of whether it can be categorized as “equipment” or “supplies” by research sponsors) will be retained by Auburn University as allowed by applicable contract law.
Following rigorous screening and a pitch evaluation by an independent panel of expert judges, the top-performing innovations advance to Phase 2 for full -scale validation. This pooled fund will support the real-world deployment and accelerated performance testing of these selected technologies during upcoming research cycles at two of the nation’s premier pavement proving grounds: the NCAT Test Track and MnROAD. By exposing these innovative sections to accelerated truck traffic and extreme geographic climates, the research will deliver validated, implementable parameters that state DOTs can use to confidently integrate the next generation of paving technologies into mainstream practice. Ultimately, this pooled fund enables sponsoring agencies to minimize individual risk while maximizing their return on investment through collaborative, high-impact pavement innovation.
**Space can be reserved on the pooled fund study by returning a signed copy of the Commitment Letter (found in the “Documents” section).
Subjects: Pavement Design, Management, and Performance
General Information |
|
| Solicitation Number: | 1672 |
| Status: | Solicitation posted |
| Date Posted: | Nov 06, 2026 |
| Last Updated: | Nov 06, 2026 |
| Solicitation Expires: | Nov 06, 2027 |
| Lead Organization: | Alabama Department of Transportation |
Financial Summary |
|
| Suggested Yearly Contribution: | |
| Commitment Start Year: | 2027 |
| Commitment End Year: | 2030 |
| 100% SP&R Approval: | Not Requested |
| Commitments Required: | $6,800,000.00 |
| Commitments Received: | |
Contact Information |
|
| Lead Study Contact(s): | Kidada Dixon |
| dixonk@dot.state.al.us | |
The NCAT Pavement Test Track was originally
constructed as a result of interest and support from state Departments of
Transportation (DOTs) who shared a concern for building and preserving safe,
sustainable, resilient, and cost-effective pavement infrastructure. Track
research operations began in the summer of 2000. Forty-six 200-ft test sections
were subjected to 10 million equivalent single axle loadings (ESALs) of heavy
truck traffic through December of 2002.
Test sections were rebuilt in 2003, 2006, 2009, 2012, 2015, 2018, 2021, and
2024 with 10 million ESALs applied within each 3-year research cycle. NCAT
began formally partnering with the MnROAD in 2015 to execute nationally
relevant research in both mix performance testing and pavement preservation.
Positive experiences with implementable findings that reduce the life cycle
cost of flexible pavements and facilitate rapid deployment of sustainable
technologies have made this research an outstanding investment for numerous
state DOTS who pool their resources to share the cost of construction,
operations, and research in a cooperative manner. The summer 2027 rebuild is the
starting point for the nineth research cycle, with many high reward research
options available for potential sponsors.
NCAT is again partnering with MnROAD in the 2027 research cycle to
execute a pavement performance experiment with nationwide implementation
impact.
The primary objectives of the
pooled fund project described herein will be: (1) constructing, maintaining and
and/or rebuilding experimental pavements on the existing 1.7-mile NCAT test
oval and the Minnesota Road Research Project (MnROAD) mainline bypass that are
representative of in-service roadways on the open transportation
infrastructure; (2) applying accelerated performance truck traffic after
construction for the duration of the 3-year research cycle; (3)
assessing/comparing the functional and structural field performance of
trafficked sections on a regular basis via surface and subsurface measures; (4)
validating /calibrating new and existing methodologies for analysis and design
using pavement surface condition, pavement load response, precise traffic and
environmental logging, and cumulative damage; (5) correlating field results
with laboratory data for both mix and structural performance; and (6) answering
practical questions posed by research sponsors through formal (i.e., reports and
technical papers) and informal (e.g., one-on-one responses to sponsor
inquiries) technology transfer.
The scope of work for the
pooled fund project will include: (1) hauling materials to the project from
offsite locations. Material donations are typically secured by state sponsors,
while reasonable hauling expenses are handled by the pooled fund; (2)
rebuilding sections in accordance with sponsors’ directives via competitively
bid subcontracts administered by NCAT. It
is anticipated that aggregate hauling, liquid asphalt supply and delivery,
rental of select construction equipment, plant production, and mix placement
may all be procured via competitively bid subcontracts; (3) installing both
environmental (i.e., multi-depth pavement temperature probes) and/or response
instrumentation (i.e., high speed stress and strain gages) in experimental
sections; (4) operating a 5-truck heavy triple-trailer fleet in order to apply
accelerated truck traffic on the NCAT test oval following the completion of
construction. Human drivers operate NCAT vehicles in order to best induce
representative vehicle wander, but it is expected that autonomous vehicles will
be implemented in the future. Diverted interstate traffic is used to load test
sections at MnROAD; (5) safely measuring field performance (e.g., rutting,
roughness, texture, cracking, deflection, friction, etc.) on a regular basis
when traffic is suspended/bypassed to fully document changes in surface
condition as a function of traffic and temperature. High-speed pavement
response is also measured on a routine basis; (6) conducting laboratory testing
on quantify basic material and mix performance properties, which will serve as
the basis of performance model development; and (7) comparing predicted and
measured pavement response as well as predicted and measured cumulative
pavement damage in order to validate then calibrate prevailing analysis and
design methodologies.
This project is expected to be eligible
for 100% State Planning and Research (SPR) funding. Each sponsor participating
in the study is asked to contribute funding as a function of the scope of their
selected research. NCAT also encourages
sponsors to consider partnering with others in group experiments designed to
meet their most pressing shared priorities.
The following summarizes the research section options and associated
annual costs for FY2027 through FY2029: (1) Structural Performance: $300,000
per existing structural section per year for 3 years for a total of $900,000;
(2) Mill and Inlay for Surface Performance: $200,000 per new mill/inlay
section per year for 3 years for a total of $600,000; (3) NextPAVE Challenge*:$250,000 per sponsor per year for 3 years for a total of $750,000; (4) Non-Structural
Continuation - also surface treatments on existing sections: $110,000 per
existing perpetual section per year for 3 years for a total of $330,000; (5) Structural
Continuation – also surface treatments on existing sections: $126,667 per
existing section per year for 3 years for a total of $380,000; (6) Off-Ramp
Performance:$100,000 per existing off-ramp section per year for 3
years (FY2027-FY2029) for a total of $300,000; (7) Off-Ramp Continuation:
$40,000 per existing off-ramp section per year for 3 years for a total of
$120,000; and/or (8) Split Sub-Section Experiments – also surface
treatments on existing sections: $30,000 per sub-section per year for 3 years
for a total of $90,000.
Funding requirements are based on reasonable assumptions; however, if project costs increase unexpectedly (i.e., fuel) a proportionate amount of additional funding or a reduced scope of work may be required. All items purchased through the pooled fund for the execution of this study (regardless of whether it can be categorized as “equipment” or “supplies” by research sponsors) will be retained by Auburn University as allowed by applicable contract law.
Following rigorous screening and a pitch evaluation by an independent panel of expert judges, the top-performing innovations advance to Phase 2 for full -scale validation. This pooled fund will support the real-world deployment and accelerated performance testing of these selected technologies during upcoming research cycles at two of the nation’s premier pavement proving grounds: the NCAT Test Track and MnROAD. By exposing these innovative sections to accelerated truck traffic and extreme geographic climates, the research will deliver validated, implementable parameters that state DOTs can use to confidently integrate the next generation of paving technologies into mainstream practice. Ultimately, this pooled fund enables sponsoring agencies to minimize individual risk while maximizing their return on investment through collaborative, high-impact pavement innovation.
**Space can be reserved on the pooled fund study by returning a signed copy of the Commitment Letter (found in the “Documents” section).
Subjects: Pavement Design, Management, and Performance
| Title | Type | Private |
|---|---|---|
| 2027 NCAT Pavement Test Track Funding Commitment Letter (ALDOT) | Other | N |